|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/28/2024 Measured TD: 7745 ft. Vertical TD: 7475 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/28/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20090352 | Expiration Date: | 4/20/2010 | | Proposed Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 59 FSL 1354 FWL | | Bottom Hole Location: | Sec:22 Twp: 3N 68W | Footage: 59 FSL 1354 FWL | | Proposed Depth/Form: | 7697 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 8/20/2009 | | Spud Date: | 8/17/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7745 ft. | Measured PB depth: | 7715 ft. | | True Vertical TD: | 7475 ft. | True Vertical PB depth: | 7445 ft. | | Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 59 FSL 1354 FWL | | Bottom Hole Location: | Sec:22 Twp: 3N 68W | Footage: 59 FSL 1354 FWL | | Log Types: | P/E AILC-CNLD-ML, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 528 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 528 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 528 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 528 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7734 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 862, Top: 1174 ft., Bottom: 7734 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2674 ft. | | N | N | | PARKMAN | 3736 ft. | | N | N | | SUSSEX | 4226 ft. | | N | N | | SHANNON | 4768 ft. | | N | N | | NIOBRARA | 7298 ft. | | N | N | | FORT HAYS | 7540 ft. | | N | N | | CODELL | 7561 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 1/8/2010 Interval Top: 7562 ft. Interval Bottom: 7577 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/23/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/6/2009 | | Treatment Summary: | 208414 GALS FLUID & 154100 LBS 30/50 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7562 ft. | # Of Holes: | 60 | | Interval Bottom: | 7577 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/28/2024 Interval Top: 7322 ft. Interval Bottom: 7577 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/23/2009 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/23/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/8/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1304 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 1948 | | CALC_MCF_GAS | 187 | | CASING_PRESS | 2100 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7322 ft. | # Of Holes: | 126 | | Interval Bottom: | 7577 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/8/2010 Interval Top: 7322 ft. Interval Bottom: 7434 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/27/2009 | | Treatment Summary: | 500 GALS ACID & 250228 GALS FLUID & 200000 LBS 30/50 SAND & 4000 LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7322 ft. | # Of Holes: | 66 | | Interval Bottom: | 7434 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/28/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|