|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/16/2017 Measured TD: 8550 ft. Vertical TD: 8455 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/16/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | 20084672 | Expiration Date: | 4/13/2010 | Prop Depth/Form: | 8536 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5523 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 260, Top: 4451 ft., Bottom: 5523 ft. |
| | |
Wellbore Completed | Completion Date: | 6/23/2009 | Spud Date: | 6/18/2009 | Spud Date Is: | ACTUAL | Measured TD: | 8550 ft. | Measured PB depth: | 8469 ft. | True Vertical TD: | 8455 ft. | True Vertical PB depth: | 8374 ft. | Top PZ Location: | Sec:19 Twp: 1N 68W | Footage: 568 FSL 548 FWL | Depth | Bottom Hole Location: | Sec:19 Twp: 1N 68W | Footage: 568 FSL 548 FWL | Depth | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 887 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 420, Top: 0 ft., Bottom: 887 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8550 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 730, Top: 4614 ft., Bottom: 8550 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4782 ft. | | N | N | NIOBRARA | 7536 ft. | | N | N | CODELL | 7932 ft. | | N | N | J SAND | 8365 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 9/21/2017 Interval Top: 8378 ft. Interval Bottom: 8390 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/21/2009 | Treatment Summary: | JSND COMPLETION. FRAC'D JSND W/ 154,056 GAL 20# VISTAR HYBRID CROSS LINKED GEL W/ 251,700# SAND. 7/21/09. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8378 ft. | # Of Holes: | 24 | Interval Bottom: | 8390 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/26/2009 Interval Top: 7676 ft. Interval Bottom: 8390 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/26/2009 | Treatment Summary: | SET CBP @ 7591'. DRILLED UP CBP @ 7591', & CFP @ 7800', 8500' TO COMMINGLE THE JSND-NBRR-CODL. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8353 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/26/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 104 | BBLS_OIL | 59 | BTU_GAS | 1082 | CALC_BBLS_H2O | 104 | CALC_BBLS_OIL | 59 | CALC_GOR | 7847 | CALC_MCF_GAS | 463 | CASING_PRESS | 999 | GRAVITY_OIL | 49 | MCF_GAS | 463 | TUBING_PRESS | 390 |
| Perforation Data: | Interval Top: | 7676 ft. | # Of Holes: | 136 | Interval Bottom: | 8390 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/21/2017 Interval Top: 7676 ft. Interval Bottom: 7948 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/21/2009 | Treatment Summary: | NB-CD COMPLTN. SET CFP@ 8050'. FRACD CD W/110,040 GAL 24# -18# VISTAR HYBRID CROSS LINKED GEL W/ 251,720# 20/40 SAND. SET CFP@ 7800'. FRACD NB W/ 131,964 GAL 18# VISTAR X-LINKED GEL HYBRID W/ 251,800# 20/40 SND. 7/21/09 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/26/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 82 | BBLS_OIL | 100 | BTU_GAS | 1167 | CALC_BBLS_H2O | 82 | CALC_BBLS_OIL | 100 | CALC_GOR | 3910 | CALC_MCF_GAS | 391 | CASING_PRESS | 1032 | GRAVITY_OIL | 50 | MCF_GAS | 391 |
| Perforation Data: | Interval Top: | 7676 ft. | # Of Holes: | 112 | Interval Bottom: | 7948 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|