|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/25/2018 Measured TD: 8010 ft. Vertical TD: 7864 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/25/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20090952 | Expiration Date: | 3/18/2010 | | Proposed Top PZ Location: | Sec:28 Twp: 3N 68W | Footage: 528 577 | | Bottom Hole Location: | Sec:28 Twp: 3N 68W | Footage: 528 577 | | Proposed Depth/Form: | 7840 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4725 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 3805 ft., Bottom: 4725 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/10/2009 | | Spud Date: | 7/5/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8010 ft. | Measured PB depth: | 7949 ft. | | True Vertical TD: | 7864 ft. | True Vertical PB depth: | 7803 ft. | | Top PZ Location: | Sec:28 Twp: 3N 68W | Footage: 528 FNL 577 FEL | | Bottom Hole Location: | Sec:28 Twp: 3N 68W | Footage: 528 FNL 577 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 732 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 732 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7998 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 5550 ft., Bottom: 7998 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7120 ft. | | N | N | | CODELL | 7386 ft. | | N | N | | J SAND | 7837 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/25/2018 Interval Top: 7840 ft. Interval Bottom: 7865 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/16/2009 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND WITH 151,704 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,160# SAND. 07/16/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7840 ft. | # Of Holes: | 40 | | Interval Bottom: | 7865 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/18/2009 Interval Top: 7180 ft. Interval Bottom: 7865 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/10/2009 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP'S TO COMMINGLE THE JSND-NBRR-CDL. 8/26/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7832 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/18/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 33 | | BBLS_OIL | 51 | | BTU_GAS | 1228 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 51 | | CALC_GOR | 11078 | | CALC_MCF_GAS | 565 | | CASING_PRESS | 803 | | GRAVITY_OIL | 49 | | MCF_GAS | 565 | | TUBING_PRESS | 496 |
| | Perforation Data: | | Interval Top: | 7180 ft. | # Of Holes: | 160 | | Interval Bottom: | 7865 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/25/2018 Interval Top: 7180 ft. Interval Bottom: 7432 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/16/2009 | | Treatment Summary: | NBRR-CDL COMPLETION. CFP @ 7490'. 07-16-09. FRAC'D THE CODELL WITH 109,200 GAL 24# TO 16# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,700# SAND. 07/16/09. SET CFP @ 7310'. 07/16/09. FRAC'D THE NIOBRARA W/131,712 GAL 18# VISTAR CONT NEXT PAGE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/1/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BBLS_OIL | 165 | | BTU_GAS | 1248 | | CALC_BBLS_H2O | 46 | | CALC_BBLS_OIL | 165 | | CALC_GOR | 1364 | | CALC_MCF_GAS | 225 | | GRAVITY_OIL | 49 | | MCF_GAS | 225 |
| | Perforation Data: | | Interval Top: | 7180 ft. | # Of Holes: | 120 | | Interval Bottom: | 7432 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/25/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|