|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/3/2020 Measured TD: 8674 ft. Vertical TD: 8580 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/3/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/24/2011 | | Proposed Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 107 FSL 1349 FEL | | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 134 FSL 1337 FEL | | Proposed Depth/Form: | 8647 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1080 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1080 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8569 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7359 ft., Bottom: 8569 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5629 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4579 ft., Bottom: 5629 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/14/2011 | | Spud Date: | 6/8/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8674 ft. | Measured PB depth: | 8632 ft. | | True Vertical TD: | 8580 ft. | True Vertical PB depth: | 8538 ft. | | Top PZ Location: | Sec:20 Twp: 1N 68W | Footage: 107 FSL 1349 FEL | | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 134 FSL 1337 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1212 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 1212 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8653 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 622, Top: 4800 ft., Bottom: 8653 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4475 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 3730 ft., Bottom: 4475 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1400 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 895 ft., Bottom: 1400 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3730 ft., Depth: 4475 ft., Bottom: 4500 ft., Sacks: 100, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 895 ft., Depth: 1421 ft., Bottom: 1400 ft., Sacks: 125, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4846 ft. | | | | | NIOBRARA | 7642 ft. | | | | | CODELL | 8082 ft. | | | | | J SAND | 8518 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 12/3/2020 Interval Top: 8522 ft. Interval Bottom: 8542 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/1/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 8522'-8542', (40 HOLES) W/65,478 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,000# 20/40 SAND. 08/01/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8522 ft. | # Of Holes: | 40 | | Interval Bottom: | 8542 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 1/19/2012 Interval Top: 7664 ft. Interval Bottom: 8522 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/19/2012 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7600’. 10/17/11. DRILLED OUT CBP @ 7600', CFP @ 7890', 8160' TO COMMINGLE THE JSND-CDL-NBRR. 10/22/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8503 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 29 | | BTU_GAS | 1162 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 5379 | | CALC_MCF_GAS | 156 | | CASING_PRESS | 1789 | | GRAVITY_OIL | 49 | | MCF_GAS | 156 | | TUBING_PRESS | 210 |
| | Perforation Data: | | Interval Top: | 7664 ft. | # Of Holes: | 196 | | Interval Bottom: | 8522 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/3/2020 Interval Top: 7650 ft. Interval Bottom: 8100 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/1/2011 | | Treatment Summary: | NBRR-CODL COMPLETION: SET CFP @ 8160’. 08/01/2011. FRAC’D THE CODELL 8082’-8100’, (36 HOLES) W/77,742 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,100# 40/70 SAND. 08/01/11. SET CFP @ 7890’. 08/01/11. FRAC’D THE NIOBRARA 7650’-7840’ (120 HOLES), W/99,826 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,169 # 40/70 SAND. 08/01/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7650 ft. | # Of Holes: | 156 | | Interval Bottom: | 8100 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/03/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|