|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/25/2024 Measured TD: 8162 ft. Vertical TD: 8084 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/25/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20090587 | Expiration Date: | 2/26/2010 | Proposed Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 1354 FNL 2565 FEL | Bottom Hole Location: | Sec:21 Twp: 2N 68W | Footage: 1354 FNL 2565 FEL | Proposed Depth/Form: | 8135 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5073 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 4101 ft., Bottom: 5073 ft. |
| | |
Wellbore Completed | Completion Date: | 4/27/2009 | Spud Date: | 4/22/2009 | Spud Date Is: | ACTUAL | Measured TD: | 8162 ft. | Measured PB depth: | 8142 ft. | True Vertical TD: | 8084 ft. | True Vertical PB depth: | 8064 ft. | Top PZ Location: | Sec:21 Twp: 2N 68W | Footage: 1354 FNL 2565 FEL | Bottom Hole Location: | Sec:21 Twp: 2N 68W | Footage: 1354 FNL 2565 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 787 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 410, Top: 0 ft., Bottom: 787 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8135 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: 900, Top: 2988 ft., Bottom: 8135 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7322 ft. | | N | N | CODELL | 7542 ft. | | N | N | J SAND | 7976 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/30/2022 Interval Top: 7976 ft. Interval Bottom: 7996 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/7/2009 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE JSAND W/152,796 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,600# SAND. 05/07/09. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7976 ft. | # Of Holes: | 40 | Interval Bottom: | 7996 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 9/13/2022 Interval Top: 7542 ft. Interval Bottom: 7562 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/30/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7542 ft. | # Of Holes: | 40 | Interval Bottom: | 7562 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/29/2009 Interval Top: 7322 ft. Interval Bottom: 7996 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/27/2009 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. SET CBP @7210'. 05/20/09. DRILLED OUT CBP @ 7210'. 05/21/09. DRILLED OUT CFP @ 7450' AND 7650' TO COMMINGLE THE JSND-NBRR-CDL 05/25/09. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7956 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/29/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 24 | BBLS_OIL | 59 | BTU_GAS | 1256 | CALC_BBLS_H2O | 24 | CALC_BBLS_OIL | 59 | CALC_GOR | 6559 | CALC_MCF_GAS | 387 | CASING_PRESS | 978 | GRAVITY_OIL | 48 | MCF_GAS | 387 | TUBING_PRESS | 491 |
| Perforation Data: | Interval Top: | 7322 ft. | # Of Holes: | 160 | Interval Bottom: | 7996 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/30/2022 Interval Top: 7322 ft. Interval Bottom: 7562 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/7/2009 | Treatment Summary: | NBRR-CDL COMPLETION. SET CFP @7650'. 05/07/09. FRAC'D THE CODELL WITH 108,822 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,380# 20/40 SAND. 05/07/09. SET CFP @ 7450'. 05/07/09. FRAC'D THE NIOBRARA W/140,490 GAL 18# VISTAR CROSS CONT NEXT PAGE |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 42 | BBLS_OIL | 55 | BTU_GAS | 1256 | CALC_BBLS_H2O | 42 | CALC_BBLS_OIL | 55 | CALC_GOR | 10963 | CALC_MCF_GAS | 603 | CASING_PRESS | 349 | GRAVITY_OIL | 48 | MCF_GAS | 603 |
| Perforation Data: | Interval Top: | 7322 ft. | # Of Holes: | 120 | Interval Bottom: | 7562 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/13/2022 Interval Top: 7322 ft. Interval Bottom: 7342 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/30/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7322 ft. | # Of Holes: | 80 | Interval Bottom: | 7342 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 10/25/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|