Wellbore #00 Wellbore Classification: GW Status: TA - 12/28/2020 Measured TD: 8065 ft. Vertical TD: 7988 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 12/28/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20090495 | Expiration Date: | 2/25/2010 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 66W | Footage: 84 FSL 1351 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 66W | Footage: 84 FSL 1351 FEL | | Proposed Depth/Form: | 8040 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | 36-8-8 | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5299 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 4338 ft., Bottom: 5299 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/10/2009 | | Spud Date: | 6/5/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8065 ft. | Measured PB depth: | 8026 ft. | | True Vertical TD: | 7988 ft. | True Vertical PB depth: | 7949 ft. | | Top PZ Location: | Sec:8 Twp: 2N 66W | Footage: 84 FSL 1351 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 66W | Footage: 84 FSL 1351 FEL | | Log Types: | CBL, CD/CN/DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 783 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 783 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8049 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 5870 ft., Bottom: 8049 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5022 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 4225 ft., Bottom: 5022 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4427 ft. | | N | N | | SHANNON | 5054 ft. | | N | N | | NIOBRARA | 7177 ft. | | N | N | | CODELL | 7442 ft. | | N | N | | J SAND | 7862 ft. | | N | N |
Formation JSND Formation Classification: GW Status: TA - 12/28/2020 Interval Top: 7896 ft. Interval Bottom: 7916 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/23/2009 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/9/2012 | | Treatment Summary: | A CIBP was set @ 7510' on 1/9/12 to plug back the J Sand to refrac and test the Codell-Niobrara. | | Formation Treatment | | Treatment Date: | 6/23/2009 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND WITH 151,200 GAL 20# VISTAR HYBRID X-LINKED GEL CONTAINING 251,400# 20/40 SAND. 6/23/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7896 ft. | # Of Holes: | 40 | | Interval Bottom: | 7916 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/10/2012 Interval Top: 7442 ft. Interval Bottom: 7460 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/23/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/9/2012 | | Treatment Summary: | Codell Refrac
Frac’d the Codell 7442’ – 7460’ with 147,869 gal frac fluid and 360,700 # sand. 01-09-12
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7442 ft. | # Of Holes: | 36 | | Interval Bottom: | 7460 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/8/2009 Interval Top: 7230 ft. Interval Bottom: 7916 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/10/2009 | | Treatment Summary: | JSND-NB-CD COMMINGLE. DRILLED UP CFP'S @ 7330' AND 7550' TO COMMINGLE THE JSND-NB-CD 8/3/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7876 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/8/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BBLS_OIL | 48 | | BTU_GAS | 1311 | | CALC_BBLS_H2O | 46 | | CALC_BBLS_OIL | 47 | | CALC_GOR | 6146 | | CALC_MCF_GAS | 295 | | CASING_PRESS | 1200 | | GRAVITY_OIL | 49 | | MCF_GAS | 295 | | TUBING_PRESS | 631 |
| | Perforation Data: | | Interval Top: | 7230 ft. | # Of Holes: | 140 | | Interval Bottom: | 7916 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 12/28/2020 Interval Top: 7230 ft. Interval Bottom: 7460 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/23/2009 | | Treatment Summary: | NB-CD COMPLETION. SET CFP @ 7500' FRAC'D THE CD W/ 109,032 GAL 24# VISTAR HYBRID X-LINKED GEL CONTAINING 250, 540# 20/40 SAND 6/23/09. SET CFP @ 7330' FRAC'D NB W/141,120 GAL 18# VISTAR X-LINKED GAL CONTINING 250,460# 20/40 SAND 6/23/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 26 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 104 | | CALC_GOR | 3385 | | CALC_MCF_GAS | 352 | | CASING_PRESS | 754 | | GRAVITY_OIL | 52 | | MCF_GAS | 88 | | TUBING_PRESS | 556 |
| | Perforation Data: | | Interval Top: | 7230 ft. | # Of Holes: | 116 | | Interval Bottom: | 7460 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/10/2012 Interval Top: 7230 ft. Interval Bottom: 7250 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/23/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/9/2012 | | Treatment Summary: | Niobrara Refrac
Frac’d the Niobrara from 7230’- 7250’ with 136,714 gal frac fluid and 250,800 # sand. 01-09-12
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7230 ft. | # Of Holes: | 80 | | Interval Bottom: | 7250 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 05/31/2020 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|