|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/1/2017 Measured TD: 7675 ft. Vertical TD: 7536 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/1/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20088522 | Expiration Date: | 2/25/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 90 FSL 1300 FWL | | Bottom Hole Location: | Sec:2 Twp: 2N 68W | Footage: 90 FSL 1300 FWL | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 710 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 497, Top: 0 ft., Bottom: 710 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7657 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7657 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/3/2010 | | Spud Date: | 1/30/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7675 ft. | Measured PB depth: | 7622 ft. | | True Vertical TD: | 7536 ft. | True Vertical PB depth: | 7483 ft. | | Top PZ Location: | Sec:2 Twp: 2N 68W | Footage: 100 FSL 1293 FWL | | Bottom Hole Location: | Sec:2 Twp: 2N 68W | Footage: 104 FSL 1298 FWL | | Log Types: | CD-CN-ML, DI-GL-GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 731 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 460, Top: 0 ft., Bottom: 731 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7656 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 885, Top: 900 ft., Bottom: 7656 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3740 ft. | 3972 ft. | | | | SUSSEX | 4212 ft. | 4400 ft. | | | | SHANNON | 4756 ft. | 4904 ft. | | | | NIOBRARA | 7210 ft. | | | | | FORT HAYS | 7454 ft. | | | | | CODELL | 7475 ft. | | | |
Formation NB-CD Formation Classification: OW Status: AB - 8/1/2017 Interval Top: 7216 ft. Interval Bottom: 7406 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/13/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2010 | | Treatment Summary: | NB PERF 7216-7358 HOLES 66 SIZE 0.47. CD PERF 7476-7496 HOLES 60 SIZE 0.38. FRAC NB W/500 GAL 15% HC1 & 235,162 GAL SW W/200,460# 40/70 & 4,000# 20/40 SB EXCEL. FRAC CD W/191,478 GAL SW W/150,540# 40/70 & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/25/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1333 | | CALC_BBLS_OIL | 66 | | CALC_GOR | 2864 | | CALC_MCF_GAS | 189 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 49 |
| | Perforation Data: | | Interval Top: | 7216 ft. | # Of Holes: | 126 | | Interval Bottom: | 7406 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/01/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|