|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/3/2023 Measured TD: 8245 ft. Vertical TD: 7921 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/3/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20090353 | Expiration Date: | 2/16/2010 | | Proposed Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 1968 FNL 1972 FWL | | Bottom Hole Location: | Sec:22 Twp: 3N 68W | Footage: 1968 FNL 1972 FWL | | Proposed Depth/Form: | 8254 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2NW4 |
| | |
| Wellbore Completed | | Completion Date: | 8/9/2009 | | Spud Date: | 8/5/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8245 ft. | Measured PB depth: | 8214 ft. | | True Vertical TD: | 7921 ft. | True Vertical PB depth: | 7890 ft. | | Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 1968 FNL 1972 FWL | | Bottom Hole Location: | Sec:22 Twp: 3N 68W | Footage: 1968 FNL 1972 FWL | | Log Types: | PNN, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 550 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 550 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8233 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 6850 ft., Bottom: 8233 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5330 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 0 ft., Bottom: 5420 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3796 ft. | | N | N | | SUSSEX | 4318 ft. | | N | N | | NIOBRARA | 7305 ft. | | N | N | | FORT HAYS | 7630 ft. | | N | N | | CODELL | 7647 ft. | | N | N | | J SAND | 8087 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/12/2010 Interval Top: 7632 ft. Interval Bottom: 7647 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/24/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/16/2009 | | Treatment Summary: | 205,656 GALS & 150, 380 LBS 40/70 SAND & 4,000 LBS LBS 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7632 ft. | # Of Holes: | 60 | | Interval Bottom: | 7647 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/3/2023 Interval Top: 7382 ft. Interval Bottom: 7647 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/24/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/16/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1201 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 89 | | CALC_GOR | 866 | | CALC_MCF_GAS | 77 | | CASING_PRESS | 2000 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7382 ft. | # Of Holes: | 124 | | Interval Bottom: | 7647 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/12/2010 Interval Top: 7382 ft. Interval Bottom: 7506 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/24/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/21/2009 | | Treatment Summary: | 500 GALS ACID & 244, 068 GALS FLUID & 200,000 LBE 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7382 ft. | # Of Holes: | 64 | | Interval Bottom: | 7506 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/03/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|