Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30063
Well Classification: OW Status: PA - 10/28/2024
Well Name/No:MEAD PLACE #20-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/28/2024
FacilityID:301594LocationID:336325
Municipality/County:MEAD / WELD #123Location:NESW 22 3N68W 6
Field:WATTENBERG - #90750Elevation:4979 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1613FSL  1676 FWLLat/Long: 40.208570 / -104.992390Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.208567 / -104.992390Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/28/2024             Measured TD: 7915 ft.    Vertical TD: 7473 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/28/2024
Wellbore PermitDIRECTIONAL
Permit #:20090359 Expiration Date:2/16/2010
Proposed Top PZ Location:Sec: Twp: Footage: 1360 FSL  1490 FEL
Bottom Hole Location:Sec:22 Twp: 3N 68W Footage: 1360 FSL  1490 FEL
Proposed Depth/Form:7910 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:9/17/2009
Spud Date:9/13/2009Spud Date Is:ACTUAL
Measured TD:7915 ft.Measured PB depth:7867 ft.
True Vertical TD:7473 ft.True Vertical PB depth:7425 ft.
Top PZ Location:Sec:22 Twp: 3N 68WFootage: 1375 FSL  1484 FEL
Bottom Hole Location:Sec:22 Twp: 3N 68WFootage: 1375 FSL  1484 FEL
Log Types:P/E AILC-CNDL-ML, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 551 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 551 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7903 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 894, Top: 765 ft., Bottom: 7903 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3918 ft.4002 ft.NN
SUSSEX4427 ft.4674 ft.NN
SHANNON4982 ft.5022 ft.NN
NIOBRARA7469 ft.NN
FORT HAYS7729 ft.NN
CODELL7748 ft.NN

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/28/2024                Interval Top: 7508 ft.    Interval Bottom: 7768 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/16/2009Choke Size:0.219 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/7/2009
Treatment Summary:452816 GALS FLUID & 342000 LBS 40/70 SAND & 8000 LBS 20/40 SB EXCEL. PERF NIO FROM 7508-7628 30 TOTAL PERFS; PERF CODELL 7753-7768 30 TOTAL PERFS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/8/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1284
CALC_BBLS_OIL 45
CALC_GOR 1956
CALC_MCF_GAS 88
CASING_PRESS 700
GRAVITY_OIL 51
Perforation Data:
Interval Top:7508 ft.# Of Holes:60
Interval Bottom:7768 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/28/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No