|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 5/1/2024 Measured TD: 7862 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 5/1/2024 | Wellbore Permit | | Permit #: | 20088618 | Expiration Date: | 2/9/2010 | Prop Depth/Form: | 8050 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: UNSPACED , Unit Acreage: 40, Drill Unit: SENW | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: UNSPACED , Unit Acreage: 40, Drill Unit: SENW | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: UNSPACED , Unit Acreage: 40, Drill Unit: SENW |
| | |
Wellbore Completed | Completion Date: | 12/6/2009 | Spud Date: | 12/1/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7862 ft. | Measured PB depth: | 7836 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP. DENSITY & NEUTRON MICROLOG, DUAL INDUCTION/GR, CEMENT BOND LOG/GR CCL/VDL | Log Types: | CBL/VDL, CNL/CDL/MICRO, DUAL/IND, | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 395, Top: 0 ft., Bottom: 1150 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7853 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 943, Top: 510 ft., Bottom: 7862 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6802 ft. | 7060 ft. | | | CODELL | 7092 ft. | 7110 ft. | | | D SAND | 7568 ft. | 7578 ft. | | | J SAND | 7658 ft. | 7765 ft. | | |
Formation JSND Formation Classification: OW Status: TA - 5/1/2024 Interval Top: 7680 ft. Interval Bottom: 7706 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/22/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/19/2010 | Treatment Summary: | FRAC'D J-SAND W/ 4,000# 40/70, 360,000# 20/40 USING 119,332 GAL 18# PHASER. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7321 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/22/2010 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | RE-INJECTED | |
Test Type | Measure |
---|
BBLS_H2O | 80 | BBLS_OIL | 51 | BTU_GAS | 1242 | CALC_BBLS_H2O | 80 | CALC_BBLS_OIL | 51 | CALC_GOR | 2647 | CALC_MCF_GAS | 135 | CASING_PRESS | 100 | GRAVITY_OIL | 43 | MCF_GAS | 135 | TUBING_PRESS | 175 |
| Perforation Data: | Interval Top: | 7680 ft. | # Of Holes: | 104 | Interval Bottom: | 7706 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 07/18/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2027 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 02/04/2024 |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|