Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30020
Well Classification: GW Status: PA - 5/3/2021
Well Name/No:PLATTEVILLE #24-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/3/2021
FacilityID:301431LocationID:332583
County:WELD #123Location:NESE 13 3N66W 6
Field:WATTENBERG - #90750Elevation:5033 ft.
Planned Location:2230FSL  517 FELLat/Long: 40.224260 / -104.717610Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.224318 / -104.717610Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/29/2013
End Date: 5/29/2013
Reported: 7/3/2013
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 5/3/2021             Measured TD: 7720 ft.    Vertical TD: 7629 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 5/3/2021
Wellbore PermitDIRECTIONAL
Permit #:20090038 Expiration Date:2/9/2010
Proposed Top PZ Location:Sec:13 Twp: 3N 66W Footage: 2614 FNL  1291 FEL
Bottom Hole Location:Sec:13 Twp: 3N 66W Footage: 2614 FNL  1291 FEL
Proposed Depth/Form:7718 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:5/27/2009
Spud Date:5/23/2009Spud Date Is:ACTUAL
Measured TD:7720 ft.Measured PB depth:7667 ft.
True Vertical TD:7629 ft.True Vertical PB depth:7576 ft.
Top PZ Location:Sec:13 Twp: 3N 66WFootage: 2614 FNL  1291 FEL
Bottom Hole Location:Sec:13 Twp: 3N 66WFootage: 2614 FNL  1291 FEL
Log Types:CBL, P/E AILC-CNLD-ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 784 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 784 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7703 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 952, Top: 1526 ft., Bottom: 7703 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND3036 ft.NN
PARKMAN3811 ft.NN
SUSSEX4558 ft.NN
NIOBRARA7257 ft.NN
FORT HAYS7522 ft.NN
CODELL7544 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/27/2009                 Interval Top: 7544 ft.    Interval Bottom: 7558 ft.

 Completed Information for Formation CODELL
1st Production Date:8/26/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/12/2009
Treatment Summary:181,406 GAL FLUID & 150,060# 40/70 SAND; & 4,000# 20/40 RC SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7544 ft.# Of Holes:56
Interval Bottom:7558 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/3/2021                  Interval Top: 7268 ft.    Interval Bottom: 7558 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/26/2009Choke Size:0.281 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/27/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/27/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1210
CALC_BBLS_H2O 0
CALC_BBLS_OIL 11
CALC_GOR 21820
CALC_MCF_GAS 240
CASING_PRESS 850
GRAVITY_OIL 50
Perforation Data:
Interval Top:7268 ft.# Of Holes:114
Interval Bottom:7558 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/27/2009                 Interval Top: 7268 ft.    Interval Bottom: 7424 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/26/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/15/2009
Treatment Summary:1000 GAL ACID; 201,029 GAL FLUID; & 153,060# 40/70 SAND; 4,000# 20/40 R/C SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7268 ft.# Of Holes:58
Interval Bottom:7424 ft.Hole Size:0.42 in.

Formation PRRE                     Formation Classification:  GW                     Status:  AB - 2/5/2014                  Interval Top: 6998 ft.    Interval Bottom: 7074 ft.

 Completed Information for Formation PIERRE
1st Production Date:6/28/2013Choke Size: 
Formation Name:PIERRECommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/22/2014Treatment End Date:N/A
Treatment Summary:Set RBP @ 6940 and squeeze 30 sacks of cement from 7074 to 6998
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/29/2013Treatment End Date:5/29/2013
Treatment Summary:6226BBL SLICKWATER, 6226 BBL TOTAL FLUID. 170060# 40/70 SAND, 170060# TOTAL SAND.
Total fluid used in treatment (bbls):6226Max pressure during treatment (psi):4474
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):904
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):170060Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 1
BTU_GAS 1249
CALC_BBLS_H2O 6
CALC_BBLS_OIL 1
CALC_GOR 16154
CALC_MCF_GAS 21
CASING_PRESS 620
GRAVITY_OIL 28
MCF_GAS 21
TUBING_PRESS 480
Perforation Data:
Interval Top:6998 ft.# Of Holes:48
Interval Bottom:7074 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/03/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No