|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/28/2025 Measured TD: 7392 ft. Vertical TD: 7304 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/28/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20090016 | Expiration Date: | 2/8/2010 | | Proposed Top PZ Location: | Sec:9 Twp: 4N 67W | Footage: 1482 FNL 1310 FEL | | Bottom Hole Location: | Sec:9 Twp: 4N 67W | Footage: 1482 FNL 1310 FEL | | Proposed Depth/Form: | 7505 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 160, Drill Unit: NE4 |
| | |
| Wellbore Completed | | Completion Date: | 10/3/2009 | | Spud Date: | 9/29/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7392 ft. | Measured PB depth: | 7343 ft. | | True Vertical TD: | 7304 ft. | True Vertical PB depth: | 7255 ft. | | Top PZ Location: | Sec:9 Twp: 4N 67W | Footage: 1482 FNL 1310 FEL | | Bottom Hole Location: | Sec:9 Twp: 4N 67W | Footage: 1482 FNL 1310 FEL | | Log Types: | CBL, CNL/CDL, DUAL INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 526 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 410, Top: 0 ft., Bottom: 526 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7377 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 845, Top: 0 ft., Bottom: 7377 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6908 ft. | | N | N | | FORT HAYS | 7214 ft. | | N | N | | CODELL | 7235 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 12/31/2009 Interval Top: 7238 ft. Interval Bottom: 7246 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2009 | | Treatment Summary: | FRACD WITH 643 BBLS OF VISTAR 20# PAD, 1891 BBLS OF VISTAR 20# FLUID SYSTEM, 217360 LBS OF 20/40 WHITE SAND AND 8180 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7238 ft. | # Of Holes: | 24 | | Interval Bottom: | 7246 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/28/2025 Interval Top: 6913 ft. Interval Bottom: 7246 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/5/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 43 | | BTU_GAS | 1240 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 4209 | | CALC_MCF_GAS | 181 | | CASING_PRESS | 1933 | | GRAVITY_OIL | 48 | | MCF_GAS | 181 |
| | Perforation Data: | | Interval Top: | 6913 ft. | # Of Holes: | 92 | | Interval Bottom: | 7246 ft. | Hole Size: | 0.39 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/31/2009 Interval Top: 6913 ft. Interval Bottom: 7024 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2009 | | Treatment Summary: | PERFD NIO A 6913-6915 (4 HOLES), NIO B 7018-7024 (18 HOLES). FRACD WITH 24 BBLS 15% HCL, 1523 BBLS SLICKWATER PAD, 202 BBLS VISTAR 18# PAD, 2455 BBLS VISTAR 18# FLUID SYSTEM, 238480 LBS 30/50 WHITE SAND AND 12040 LBS SB EXCEL 20/40 RESIN COATED PROPPANT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6913 ft. | # Of Holes: | 22 | | Interval Bottom: | 7024 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/28/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|