Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-30014
Well Classification: OW Status: PA - 10/28/2025
Well Name/No:GOLD #9C-DU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/28/2025
FacilityID:301384LocationID:332616
County:WELD #123Location:NENE 9 4N67W 6
Field:WATTENBERG - #90750Elevation:4782 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:626FNL  1272 FELLat/Long: 40.332620 / -104.891190Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.332580 / -104.891190Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/28/2025             Measured TD: 7392 ft.    Vertical TD: 7304 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/28/2025
Wellbore PermitDIRECTIONAL
Permit #:20090016 Expiration Date:2/8/2010
Proposed Top PZ Location:Sec:9 Twp: 4N 67W Footage: 1482 FNL  1310 FEL
Bottom Hole Location:Sec:9 Twp: 4N 67W Footage: 1482 FNL  1310 FEL
Proposed Depth/Form:7505 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:10/3/2009
Spud Date:9/29/2009Spud Date Is:ACTUAL
Measured TD:7392 ft.Measured PB depth:7343 ft.
True Vertical TD:7304 ft.True Vertical PB depth:7255 ft.
Top PZ Location:Sec:9 Twp: 4N 67WFootage: 1482 FNL  1310 FEL
Bottom Hole Location:Sec:9 Twp: 4N 67WFootage: 1482 FNL  1310 FEL
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 526 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 526 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7377 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 845, Top: 0 ft., Bottom: 7377 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6908 ft.NN
FORT HAYS7214 ft.NN
CODELL7235 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/31/2009                Interval Top: 7238 ft.    Interval Bottom: 7246 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2009
Treatment Summary:FRACD WITH 643 BBLS OF VISTAR 20# PAD, 1891 BBLS OF VISTAR 20# FLUID SYSTEM, 217360 LBS OF 20/40 WHITE SAND AND 8180 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7238 ft.# Of Holes:24
Interval Bottom:7246 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/28/2025                Interval Top: 6913 ft.    Interval Bottom: 7246 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 43
BTU_GAS 1240
CALC_BBLS_OIL 43
CALC_GOR 4209
CALC_MCF_GAS 181
CASING_PRESS 1933
GRAVITY_OIL 48
MCF_GAS 181
Perforation Data:
Interval Top:6913 ft.# Of Holes:92
Interval Bottom:7246 ft.Hole Size:0.39 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/31/2009                Interval Top: 6913 ft.    Interval Bottom: 7024 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2009
Treatment Summary:PERFD NIO A 6913-6915 (4 HOLES), NIO B 7018-7024 (18 HOLES). FRACD WITH 24 BBLS 15% HCL, 1523 BBLS SLICKWATER PAD, 202 BBLS VISTAR 18# PAD, 2455 BBLS VISTAR 18# FLUID SYSTEM, 238480 LBS 30/50 WHITE SAND AND 12040 LBS SB EXCEL 20/40 RESIN COATED PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6913 ft.# Of Holes:22
Interval Bottom:7024 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/28/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
03/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No