Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29964
Well Classification: OW Status: PA - 7/9/2018
Well Name/No:RADEMACHER #35-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/9/2018
FacilityID:285133LocationID:336260
Municipality/County:FIRESTONE / WELD #123Location:SESW 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:469FSL  2122 FWLLat/Long: 40.191164 / -104.953082Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.191164 / -104.953082Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/26/2018             Measured TD: 7470 ft.    Vertical TD: 7384 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/26/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/14/2012
Proposed Top PZ Location:Sec:25 Twp: 3N 68W Footage: 50 FSL  1320 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68W Footage: 42 FSL  1307 FWL
Proposed Depth/Form:7476 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 704 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 704 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7465 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 3600 ft., Bottom: 7465 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:2/12/2007Spud Date Is:ACTUAL
Measured TD:7470 ft.Measured PB depth:7450 ft.
True Vertical TD:7384 ft.True Vertical PB depth:7364 ft.
Top PZ Location:Sec:25 Twp: 3N 68WFootage: 50 FSL  1320 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68WFootage: 42 FSL  1307 FWL
Log Types:CBL-CDL-CNL-ML-IEL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 717 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 717 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7467 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 3290 ft., Bottom: 7467 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1325 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 721 ft., Bottom: 1320 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 721 ft., Depth: 7467 ft., Bottom: 1320 ft., Sacks: 160, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
PARKMAN3690 ft.NN
SUSSEX4160 ft.NN
SHANNON4676 ft.NN
NIOBRARA7040 ft.NN
FORT HAYS7284 ft.NN
CODELL7303 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/21/2011                Interval Top: 7304 ft.    Interval Bottom: 7324 ft.

 Completed Information for Formation CODELL
1st Production Date:5/22/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/14/2011
Treatment Summary:03/22/07 -CD PERF 7304-7324 HOLES 60 SIZE 0.45 05/22/07 -CD 1ST DATE OF PRODUCTION 11/11/10 -SET CIBP @ 7244' 02/14/11 -DRILL CIBP AND PUSH TO BTM 02/28/11 -NB-CD COMMINGLE
Formation Treatment
Treatment Date:11/11/2010
Treatment Summary:CIBP set at 7244'
Formation Treatment
Treatment Date:3/23/2007
Treatment Summary:143,106 GAL FLUID AND 115,000 LBS 40/70 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 59
BTU_GAS 1258
CALC_BBLS_H2O 0
CALC_BBLS_OIL 59
CALC_GOR 3000
CALC_MCF_GAS 177
CASING_PRESS 350
GRAVITY_OIL 53
MCF_GAS 177
Perforation Data:
Interval Top:7304 ft.# Of Holes:60
Interval Bottom:7324 ft.Hole Size:0.45 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/9/2018                  Interval Top: 7052 ft.    Interval Bottom: 7324 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/28/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/14/2011
Treatment Summary:03/22/07 -CD PERF 7304-7324 HOLES 60 SIZE 0.45 05/22/07 -CD 1ST DATE OF PRODUCTION 11/11/10 -SET CIBP @ 7244' 11/12/10 -NB PERF 7052-7184 HOLES 60 SIZE 0.38 12/08/10 -NBRR PRODUCING ONLY 02/14/11 -DRILL CIBP AND PUSH TO BTM 02/28/11 -NB-CD COMMINGLE
Tubing Size:2.375 in.Tubing Setting Depth:7285 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 10
BTU_GAS 1237
CALC_BBLS_OIL 10
CALC_GOR 10000
CALC_MCF_GAS 100
CASING_PRESS 1800
GRAVITY_OIL 49
MCF_GAS 100
TUBING_PRESS 900
Perforation Data:
Interval Top:7052 ft.# Of Holes:120
Interval Bottom:7324 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 11/21/2011                Interval Top: 7052 ft.    Interval Bottom: 7184 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/8/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2010
Treatment Summary:11/12/10 -NB PERF 7052-7184 HOLES 60 SIZE 0.38 12/02/10 -Frac Niobrara w/ 250 gal 15% HCl & 237,764 gal Slickwater w/ 200,880# 40/70, 4,000# SB Excel 12/08/10 -NBRR PRODUCING ONLY 02/14/11 -DRILL CIBP AND PUSH TO BTM 02/28/11 -NB-CD COMMINGLE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_OIL 13
BTU_GAS 1242
CALC_BBLS_OIL 13
CALC_GOR 16076
CALC_MCF_GAS 209
CASING_PRESS 200
GRAVITY_OIL 48
MCF_GAS 209
Perforation Data:
Interval Top:7052 ft.# Of Holes:60
Interval Bottom:7184 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/09/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No