Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29964
Well Classification: OW Status: PA - 7/9/2018
Well Name/No:RADEMACHER #35-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/9/2018
FacilityID:285133LocationID:336260
Municipality/County:FIRESTONE / WELD #123Location:SESW 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Planned Location:469FSL  2122 FWLLat/Long: 40.191164 / -104.953082Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.191164 / -104.953082Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/26/2018             Measured TD: 7470 ft.    Vertical TD: 7384 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/26/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/14/2012
Proposed Top PZ Location:Sec:25 Twp: 3N 68W Footage: 50 FSL  1320 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68W Footage: 42 FSL  1307 FWL
Proposed Depth/Form:7476 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 704 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 704 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7465 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 3600 ft., Bottom: 7465 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:2/12/2007Spud Date Is:ACTUAL
Measured TD:7470 ft.Measured PB depth:7450 ft.
True Vertical TD:7384 ft.True Vertical PB depth:7364 ft.
Top PZ Location:Sec:25 Twp: 3N 68WFootage: 50 FSL  1320 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68WFootage: 42 FSL  1307 FWL
Log Types:CBL-CDL-CNL-ML-IEL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 717 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 717 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7467 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 3290 ft., Bottom: 7467 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1325 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 721 ft., Bottom: 1320 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 721 ft., Depth: 7467 ft., Bottom: 1320 ft., Sacks: 160, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
PARKMAN3690 ft.NN
SUSSEX4160 ft.NN
SHANNON4676 ft.NN
NIOBRARA7040 ft.NN
FORT HAYS7284 ft.NN
CODELL7303 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/21/2011                Interval Top: 7304 ft.    Interval Bottom: 7324 ft.

 Completed Information for Formation CODELL
1st Production Date:5/22/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/14/2011
Treatment Summary:03/22/07 -CD PERF 7304-7324 HOLES 60 SIZE 0.45 05/22/07 -CD 1ST DATE OF PRODUCTION 11/11/10 -SET CIBP @ 7244' 02/14/11 -DRILL CIBP AND PUSH TO BTM 02/28/11 -NB-CD COMMINGLE
Formation Treatment
Treatment Date:11/11/2010
Treatment Summary:CIBP set at 7244'
Formation Treatment
Treatment Date:3/23/2007
Treatment Summary:143,106 GAL FLUID AND 115,000 LBS 40/70 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 59
BTU_GAS 1258
CALC_BBLS_H2O 0
CALC_BBLS_OIL 59
CALC_GOR 3000
CALC_MCF_GAS 177
CASING_PRESS 350
GRAVITY_OIL 53
MCF_GAS 177
Perforation Data:
Interval Top:7304 ft.# Of Holes:60
Interval Bottom:7324 ft.Hole Size:0.45 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/9/2018                  Interval Top: 7052 ft.    Interval Bottom: 7324 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/28/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/14/2011
Treatment Summary:03/22/07 -CD PERF 7304-7324 HOLES 60 SIZE 0.45 05/22/07 -CD 1ST DATE OF PRODUCTION 11/11/10 -SET CIBP @ 7244' 11/12/10 -NB PERF 7052-7184 HOLES 60 SIZE 0.38 12/08/10 -NBRR PRODUCING ONLY 02/14/11 -DRILL CIBP AND PUSH TO BTM 02/28/11 -NB-CD COMMINGLE
Tubing Size:2.375 in.Tubing Setting Depth:7285 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 10
BTU_GAS 1237
CALC_BBLS_OIL 10
CALC_GOR 10000
CALC_MCF_GAS 100
CASING_PRESS 1800
GRAVITY_OIL 49
MCF_GAS 100
TUBING_PRESS 900
Perforation Data:
Interval Top:7052 ft.# Of Holes:120
Interval Bottom:7324 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 11/21/2011                Interval Top: 7052 ft.    Interval Bottom: 7184 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/8/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2010
Treatment Summary:11/12/10 -NB PERF 7052-7184 HOLES 60 SIZE 0.38 12/02/10 -Frac Niobrara w/ 250 gal 15% HCl & 237,764 gal Slickwater w/ 200,880# 40/70, 4,000# SB Excel 12/08/10 -NBRR PRODUCING ONLY 02/14/11 -DRILL CIBP AND PUSH TO BTM 02/28/11 -NB-CD COMMINGLE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_OIL 13
BTU_GAS 1242
CALC_BBLS_OIL 13
CALC_GOR 16076
CALC_MCF_GAS 209
CASING_PRESS 200
GRAVITY_OIL 48
MCF_GAS 209
Perforation Data:
Interval Top:7052 ft.# Of Holes:60
Interval Bottom:7184 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/09/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No