|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 2/1/2025 Measured TD: 7789 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 2/1/2025 | Wellbore Permit | | Permit #: | | Expiration Date: | 6/22/2012 | Proposed Depth/Form: | 7800 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 0 ft., Bottom: 650 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7800 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 739, Top: , Bottom: 7800 ft. |
| | |
Wellbore Completed | Completion Date: | 1/14/2012 | Spud Date: | 1/13/2012 | Spud Date Is: | ACTUAL | Measured TD: | 7789 ft. | Measured PB depth: | 7707 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | TRIPLE COMBO, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 735 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 243, Top: 13 ft., Bottom: 735 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 13 ft., Depth: 7753 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 1320 ft., Bottom: 7753 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6837 ft. | | N | N | FORT HAYS | 7107 ft. | | | | CODELL | 7133 ft. | | | | J SAND | 7581 ft. | | | |
Formation JSND Formation Classification: OW Status: TA - 2/1/2025 Interval Top: 7584 ft. Interval Bottom: 7608 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/21/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/19/2012 | Treatment Summary: | J SAND-PUMPED 247156# OTTAWA SAND AND 12169# SC Excel IN 158697 GALS Silverstim/SLICK/GELLED WATER.
CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7584 ft. | # Of Holes: | 72 | Interval Bottom: | 7608 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 1/10/2013 Interval Top: 7133 ft. Interval Bottom: 7147 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/21/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/19/2012 | Treatment Summary: | CODELL-PUMPED 231008# OTTAWA 20/40 SAND AND 125511 GALS OF 15% HCL/SilverStim/SLICK/GELLED H2O.
CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7133 ft. | # Of Holes: | 56 | Interval Bottom: | 7147 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/24/2012 Interval Top: 6906 ft. Interval Bottom: 7608 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/20/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/24/2012 | Treatment Summary: | CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/24/2012 | Test Method: | FLOWING | Hours Tested: | 8 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 32 | BBLS_OIL | 32 | BTU_GAS | 1217 | CALC_BBLS_H2O | 32 | CALC_BBLS_OIL | 32 | CALC_GOR | 6843 | CALC_MCF_GAS | 219 | CASING_PRESS | 1350 | GRAVITY_OIL | 57 | MCF_GAS | 219 |
| Perforation Data: | Interval Top: | 6906 ft. | # Of Holes: | 176 | Interval Bottom: | 7608 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: TA - 2/1/2025 Interval Top: 6906 ft. Interval Bottom: 7147 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/21/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 1/10/2013 | Treatment End Date: | N/A | Treatment Summary: | CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 6906 ft. | # Of Holes: | 104 | Interval Bottom: | 7147 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/10/2013 Interval Top: 6906 ft. Interval Bottom: 7012 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/21/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/19/2012 | Treatment Summary: | NIOBRARA-PUMPED 235040# OTTAWA 20/40 SAND AND 164454 GALS OF SilverStim/SLICK/GELLED/FRESH WATER.
CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6906 ft. | # Of Holes: | 48 | Interval Bottom: | 7012 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 08/06/2024 |
Low Producing | Y | Production Period 02/2024 - 01/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|