|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 2/1/2025 Measured TD: 7789 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 2/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 6/22/2012 | | Proposed Depth/Form: | 7800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7800 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 739, Top: , Bottom: 7800 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/14/2012 | | Spud Date: | 1/13/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7789 ft. | Measured PB depth: | 7707 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | TRIPLE COMBO, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 735 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 243, Top: 13 ft., Bottom: 735 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 13 ft., Depth: 7753 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 1320 ft., Bottom: 7753 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6837 ft. | | N | N | | FORT HAYS | 7107 ft. | | | | | CODELL | 7133 ft. | | | | | J SAND | 7581 ft. | | | |
Formation JSND Formation Classification: OW Status: TA - 2/1/2025 Interval Top: 7584 ft. Interval Bottom: 7608 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/21/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2012 | | Treatment Summary: | J SAND-PUMPED 247156# OTTAWA SAND AND 12169# SC Excel IN 158697 GALS Silverstim/SLICK/GELLED WATER.
CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7584 ft. | # Of Holes: | 72 | | Interval Bottom: | 7608 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 1/10/2013 Interval Top: 7133 ft. Interval Bottom: 7147 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/21/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2012 | | Treatment Summary: | CODELL-PUMPED 231008# OTTAWA 20/40 SAND AND 125511 GALS OF 15% HCL/SilverStim/SLICK/GELLED H2O.
CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7133 ft. | # Of Holes: | 56 | | Interval Bottom: | 7147 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/24/2012 Interval Top: 6906 ft. Interval Bottom: 7608 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/20/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/24/2012 | | Treatment Summary: | CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/24/2012 | Test Method: | FLOWING | | Hours Tested: | 8 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 32 | | BTU_GAS | 1217 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 6843 | | CALC_MCF_GAS | 219 | | CASING_PRESS | 1350 | | GRAVITY_OIL | 57 | | MCF_GAS | 219 |
| | Perforation Data: | | Interval Top: | 6906 ft. | # Of Holes: | 176 | | Interval Bottom: | 7608 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: TA - 2/1/2025 Interval Top: 6906 ft. Interval Bottom: 7147 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/21/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/10/2013 | Treatment End Date: | N/A | | Treatment Summary: | CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6906 ft. | # Of Holes: | 104 | | Interval Bottom: | 7147 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/10/2013 Interval Top: 6906 ft. Interval Bottom: 7012 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/21/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2012 | | Treatment Summary: | NIOBRARA-PUMPED 235040# OTTAWA 20/40 SAND AND 164454 GALS OF SilverStim/SLICK/GELLED/FRESH WATER.
CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW THROUGH PLUGS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6906 ft. | # Of Holes: | 48 | | Interval Bottom: | 7012 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 03/31/2015 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|