Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29836
Well Classification: OW Status: PA - 5/26/2022
Well Name/No:LUNDVALL J #18-02D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/26/2022
FacilityID:300723LocationID:333155
Municipality/County:GREELEY / WELD #123Location:SWNE 18 5N66W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2049FNL  1905 FELLat/Long: 40.401163 / -104.820097Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.401160 / -104.820094Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/26/2022             Measured TD: 7796 ft.    Vertical TD: 7602 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/26/2022
Wellbore PermitDIRECTIONAL
Permit #:20087847 Expiration Date:1/11/2010
Proposed Top PZ Location:Sec:18 Twp: 5N 66W Footage: 655 FNL  1997 FEL
Bottom Hole Location:Sec:18 Twp: 5N 66W Footage: 654 FNL  1997 FEL
Proposed Depth/Form:7715 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 450 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 192, Top: 0 ft., Bottom: 450 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7715 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 476, Top: , Bottom: 7715 ft.

Wellbore Completed
Completion Date:5/23/2009
Spud Date:5/20/2009Spud Date Is:ACTUAL
Measured TD:7796 ft.Measured PB depth:7762 ft.
True Vertical TD:7602 ft.True Vertical PB depth:7568 ft.
Top PZ Location:Sec:18 Twp: 5N 66WFootage: 655 FNL  1997 FEL
Bottom Hole Location:Sec:18 Twp: 5N 66WFootage: 654 FNL  1997 FEL
Log Types:CBL/GR/CCL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 529 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 194, Top: 0 ft., Bottom: 529 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7779 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 1470 ft., Bottom: 7779 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE2826 ft.
PARKMAN3897 ft.
SUSSEX4647 ft.
SHANNON5064 ft.
TEEPEE BUTTES6494 ft.
NIOBRARA7271 ft.
FORT HAYS7580 ft.
CODELL7601 ft.
GREENHORN7685 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/8/2010                 Interval Top: 7602 ft.    Interval Bottom: 7620 ft.

 Completed Information for Formation CODELL
1st Production Date:10/11/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/9/2009
Treatment Summary:FRACD CODELL W/ 134064 GALS OF SLICK WATER, SILVERSTIM, AND 15% HCI WITH 269000#S OF OTTAWA SAND. CODELL PRODUCING THROUGH FLOW PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7602 ft.# Of Holes:72
Interval Bottom:7620 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 5/26/2022                 Interval Top: 7425 ft.    Interval Bottom: 7620 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/9/2009
Treatment Summary:COMMINGLE CODELL AND NIOBRARA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 28
BTU_GAS 1257
CALC_BBLS_H2O 40
CALC_BBLS_OIL 28
CALC_GOR 5857
CALC_MCF_GAS 164
CASING_PRESS 260
GRAVITY_OIL 57
MCF_GAS 164
Perforation Data:
Interval Top:7425 ft.# Of Holes:120
Interval Bottom:7620 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/8/2010                 Interval Top: 7425 ft.    Interval Bottom: 7504 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/11/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/9/2009
Treatment Summary:FRACD NIOBRARA W/ 195860 GALS OF SLICK WATER, SILVERSTIM, AND 15% HCI WITH 300000#S OF OTTAWA SAND. NIOBRARA PRODUCING THROUGH FLOW PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7425 ft.# Of Holes:48
Interval Bottom:7504 ft.Hole Size:0.72 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/26/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No