|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/21/2018 Measured TD: 8595 ft. Vertical TD: 8342 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/21/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/27/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 1980 FSL 1980 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 1980 FSL 1980 FEL | | Proposed Depth/Form: | 8564 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2SE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8564 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 7438 ft., Bottom: 8564 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5486 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4438 ft., Bottom: 5486 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/12/2011 | | Spud Date: | 4/8/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8595 ft. | Measured PB depth: | 8537 ft. | | True Vertical TD: | 8342 ft. | True Vertical PB depth: | 8284 ft. | | Top PZ Location: | Sec:5 Twp: 1N 68W | Footage: 1985 FSL 1974 FEL | | Bottom Hole Location: | Sec:5 Twp: 1N 68W | Footage: 1984 FSL 1992 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1093 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 435, Top: 0 ft., Bottom: 1093 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8581 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 718, Top: 3450 ft., Bottom: 8581 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4710 ft. | | | | | NIOBRARA | 7718 ft. | | | | | CODELL | 8018 ft. | | | | | J SAND & SHANNON | 8448 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 6/21/2018 Interval Top: 8458 ft. Interval Bottom: 8476 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/6/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 8458'-8476', (36 HOLES) W/154,010 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,809 # 20/40 SAND. 06/06/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8458 ft. | # Of Holes: | 36 | | Interval Bottom: | 8476 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: AB - 6/21/2018 Interval Top: 8018 ft. Interval Bottom: 8038 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/9/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8018 ft. | # Of Holes: | 40 | | Interval Bottom: | 8038 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/22/2011 Interval Top: 7814 ft. Interval Bottom: 8476 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/22/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7460'. 06/29/2011. DRILLED OUT CBP @ 7460' 07/16/2011. DRILLED OUT CFP @ 7910' AND 8150' TO COMMINGLE THE JSND-CDL-NBRR. 07/18/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7805 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/22/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 34 | | BTU_GAS | 1175 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 9147 | | CALC_MCF_GAS | 311 | | CASING_PRESS | 1745 | | GRAVITY_OIL | 50 | | MCF_GAS | 311 | | TUBING_PRESS | 709 |
| | Perforation Data: | | Interval Top: | 7814 ft. | # Of Holes: | 124 | | Interval Bottom: | 8476 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: CM - 10/13/2011 Interval Top: 7814 ft. Interval Bottom: 8038 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/8/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 8150'. 06/08/2011. FRAC'D THE CODELL 8018'-8038' (40 HOLES) W/107,772 GAL 21 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,685 # 20/40 SAND. 06/08/11. SET CFP @ 7910'. 06/09/11. FRAC'D THE NIOBRARA 7814'-7826' (48 HOLES), W/79,262 GALS 19 # VISTAR HYB RID CROSS LINKED GEL CONTAINING 33,774 # 20/40 SAND. 06/09/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7814 ft. | # Of Holes: | 88 | | Interval Bottom: | 8038 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: AB - 6/21/2018 Interval Top: 7814 ft. Interval Bottom: 7826 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7814 ft. | # Of Holes: | 48 | | Interval Bottom: | 7826 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/21/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|