Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29765
Well Classification: GW Status: PA - 8/12/2024
Well Name/No:ROACH N #13-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/12/2024
FacilityID:300569LocationID:302769
County:WELD #123Location:SESE 14 5N67W 6
Field:WATTENBERG - #90750Elevation:4925 ft.
Planned Location:1200FSL  155 FELLat/Long: 40.395500 / -104.851490Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.395511 / -104.851497Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 8/12/2024             Measured TD: 7439 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 8/12/2024
Wellbore Permit
Permit #:20087539 Expiration Date:12/30/2009
Proposed Depth/Form:7410 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:3/28/2009
Spud Date:3/25/2009Spud Date Is:ACTUAL
Measured TD:7439 ft.Measured PB depth:7420 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CR/CCL/CBL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 442 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 442 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7436 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 181 ft., Bottom: 7436 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6925 ft.NN
FORT HAYS7237 ft.NN
CODELL7259 ft.NN
GREENHORN7322 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/12/2021                 Interval Top: 7258 ft.    Interval Bottom: 7268 ft.

 Completed Information for Formation CODELL
1st Production Date:4/23/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/16/2009
Treatment Summary:FRAC'D CODELL W/133,411 GALS OF SLICK WATER AND SILVERSTIM WITH 270,860#S OF OTTAWA SAND. CODELL PRODUCING THROUGH FLOW PLUG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7258 ft.# Of Holes:40
Interval Bottom:7268 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/12/2024                 Interval Top: 6956 ft.    Interval Bottom: 7268 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/23/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/28/2009
Treatment Summary:COMINGLE CODELL AND NIOBRARA.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 80
BTU_GAS 1199
CALC_BBLS_H2O 3
CALC_BBLS_OIL 80
CALC_GOR 3862
CALC_MCF_GAS 309
CASING_PRESS 1350
GRAVITY_OIL 49
MCF_GAS 309
TUBING_PRESS 0
Perforation Data:
Interval Top:6956 ft.# Of Holes:88
Interval Bottom:7268 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/12/2021                 Interval Top: 6956 ft.    Interval Bottom: 7092 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/23/2009Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/16/2009
Treatment Summary:FRAC'D NIOBRARA W/174,174 GAL OF SLICK WATER AND SILVERSTIM WITH 250,421#S OF OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6956 ft.# Of Holes:48
Interval Bottom:7092 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/12/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No