|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2021 Measured TD: 7774 ft. Vertical TD: 7631 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20087437 | Expiration Date: | 12/29/2009 | | Proposed Top PZ Location: | Sec:1 Twp: 2N 66 | Footage: 2102 FSL 511 FEL | | Bottom Hole Location: | Sec:1 Twp: 2N 66 | Footage: 2096 FSL 509 FEL | | Proposed Depth/Form: | 8170 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SE4 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 10/29/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7774 ft. | Measured PB depth: | 7745 ft. | | True Vertical TD: | 7631 ft. | True Vertical PB depth: | 7602 ft. | | Top PZ Location: | Sec:1 Twp: 2N 66 | Footage: 2102 FSL 511 FEL | | Bottom Hole Location: | Sec:1 Twp: 2N 66 | Footage: 2096 FSL 509 FEL | | Log Types: | DI-GL-GR, CD-CN-ML, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 968 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 610, Top: 0 ft., Bottom: 968 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7764 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 1240 ft., Bottom: 7764 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1190 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 395 ft., Bottom: 1190 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 398 ft., Depth: 1165 ft., Bottom: 1188 ft., Sacks: 135, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4170 ft. | 4470 ft. | N | N | | SUSSEX | 4583 ft. | 4890 ft. | N | N | | NIOBRARA | 7280 ft. | | N | N | | FORT HAYS | 7546 ft. | | N | N | | CODELL | 7573 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 2/4/2010 Interval Top: 7574 ft. Interval Bottom: 7592 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/14/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/18/2009 | | Treatment Summary: | 203,093 GALS FLUID & 151,160 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7574 ft. | # Of Holes: | 54 | | Interval Bottom: | 7592 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 7/1/2021 Interval Top: 7334 ft. Interval Bottom: 7592 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/14/2010 | Choke Size: | 0.281 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/4/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1426 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 3834 | | CALC_MCF_GAS | 23 | | CASING_PRESS | 180 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7334 ft. | # Of Holes: | 116 | | Interval Bottom: | 7592 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 2/4/2010 Interval Top: 7334 ft. Interval Bottom: 7447 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/14/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2010 | | Treatment Summary: | 500 GALS ACID & 246,332 GALS FLUID & 201,660 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7334 ft. | # Of Holes: | 62 | | Interval Bottom: | 7447 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2021 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|