Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29702
Well Classification: OW Status: PA - 7/31/2025
Well Name/No:Phillips #23-1-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/31/2025
FacilityID:300378LocationID:332558
Municipality/County:GREELEY / WELD #123Location:NWNE 23 5N67W 6
Field:WATTENBERG - #90750Elevation:4956 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:653FNL  1604 FELLat/Long: 40.390470 / -104.856690Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.390480 / -104.856700Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/11/2011
End Date: 7/11/2011
Reported: 10/19/2011
Prior to rule 205A.b.(2)(A)
Days to report: 100
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/31/2025             Measured TD: 7510 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/31/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/4/2012
Proposed Top PZ Location:Sec:23 Twp: 5N 67W Footage: 75 FNL  1316 FEL
Bottom Hole Location:Sec:23 Twp: 5N 67W Footage: 75 FNL  1316 FEL
Proposed Depth/Form:7512 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 210, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7512 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 697, Top: , Bottom: 7512 ft.

Wellbore Completed
Completion Date:6/12/2011
Spud Date:6/8/2011Spud Date Is:ACTUAL
Measured TD:7510 ft.Measured PB depth:7456 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:23 Twp: 5N 67WFootage: 75 FNL  1316 FEL
Bottom Hole Location:Sec:23 Twp: 5N 67WFootage: 75 FNL  1316 FEL
Log Types:CBL/GRL/CCL, CDL/CNL/ML, HRIL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 540 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 188, Top: 0 ft., Bottom: 540 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7500 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 1572 ft., Bottom: 7500 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6973 ft.
FORT HAYS7290 ft.
CODELL7312 ft.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/31/2025                 Interval Top: 6994 ft.    Interval Bottom: 7336 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/12/2011Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/11/2011
Treatment Summary:Frac'd the Niobrara-Codell w/ 269430 gals of Silverstim and Slick Water with 482,945#'s of Ottawa sand. The Codell is producing through a Composite Flow Through Plug. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 51
BTU_GAS 1283
CALC_BBLS_H2O 29
CALC_BBLS_OIL 51
CALC_GOR 6784
CALC_MCF_GAS 346
CASING_PRESS 520
GRAVITY_OIL 51
MCF_GAS 346
Perforation Data:
Interval Top:6994 ft.# Of Holes:136
Interval Bottom:7336 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/31/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)249
Total Gas Produced (MCF)4232
GOR16995
GOR DeterminationMCFE
Average BOE per Day2.666
Average MCFE per Day15.473

 Federal Financial Assurance  i 

 Tribal Well  i No