Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29685
Well Classification: OW Status: SI - 3/1/2022
Well Name/No:DOLPH #35-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2022
FacilityID:300357LocationID:336503
County:WELD #123Location:SWSW 1 2N66W 6
Field:WATTENBERG - #90750Elevation:5017 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:485FSL  585 FWLLat/Long: 40.161470 / -104.732780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.161557 / -104.732824Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2022             Measured TD: 8150 ft.    Vertical TD: 8056 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2022
Wellbore PermitDIRECTIONAL
Permit #:20087143 Expiration Date:12/21/2009
Proposed Top PZ Location:Sec: Twp: Footage: 50 FSL  1320 FWL
Bottom Hole Location:Sec:1 Twp: 2N 66W Footage: 50 FSL  1320 FWL
Proposed Depth/Form:8112 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:10/5/2009
Spud Date:10/1/2009Spud Date Is:ACTUAL
Measured TD:8150 ft.Measured PB depth:8098 ft.
True Vertical TD:8056 ft.True Vertical PB depth:8004 ft.
Top PZ Location:Sec:1 Twp: 2N 66WFootage: 58 FSL  1321 FWL
Bottom Hole Location:Sec:1 Twp: 2N 66WFootage: 58 FSL  1321 FWL
Log Types:P/E AILC-CNLD-ML, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 930 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 930 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8135 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 1314 ft., Bottom: 8135 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4190 ft.4408 ft.NN
SUSSEX4642 ft.4833 ft.NN
NIOBRARA7260 ft.NN
FORT HAYS7518 ft.NN
CODELL7541 ft.NN
J SAND7992 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/14/2010                 Interval Top: 7541 ft.    Interval Bottom: 7560 ft.

 Completed Information for Formation CODELL
1st Production Date:1/4/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/30/2009
Treatment Summary:205,964 GALS FLUID & 158,280# 40/70 SAND & 4,440# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7541 ft.# Of Holes:57
Interval Bottom:7560 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 3/1/2022                  Interval Top: 7310 ft.    Interval Bottom: 7560 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/4/2010Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/3/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/14/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1232
CALC_BBLS_OIL 109
CALC_GOR 4019
CALC_MCF_GAS 438
CASING_PRESS 400
GRAVITY_OIL 51
Perforation Data:
Interval Top:7310 ft.# Of Holes:117
Interval Bottom:7560 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/14/2010                 Interval Top: 7310 ft.    Interval Bottom: 7398 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/4/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2009
Treatment Summary:500 GALS ACID & 238,631 GALS FLUID & 200,980# 40/70 SAND & 4,160# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7310 ft.# Of Holes:60
Interval Bottom:7398 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/31/2021
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No