|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/12/2024 Measured TD: 7861 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/12/2024 | Wellbore Permit | | Permit #: | | Expiration Date: | 10/15/2013 | Proposed Depth/Form: | 7861 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 553 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 217, Top: 0 ft., Bottom: 553 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7850 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 880, Top: 3573 ft., Bottom: 7850 ft. |
| | |
Wellbore Completed | Completion Date: | 4/6/2009 | Spud Date: | 4/3/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7861 ft. | Measured PB depth: | 7833 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | GR/CCL/CBL,ARRAY COMPENSATED RESISTIVITY LOG, SD/DSN | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 553 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 217, Top: 0 ft., Bottom: 553 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7850 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 880, Top: 180 ft., Bottom: 7850 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6824 ft. | | N | N | FORT HAYS | 7140 ft. | | N | N | CODELL | 7162 ft. | | N | N | GREENHORN | 7251 ft. | | N | N | D SAND | 7565 ft. | | N | N | MOWRY | 7610 ft. | | N | N | J SAND | 7628 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 1/12/2021 Interval Top: 7162 ft. Interval Bottom: 7184 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/2/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/30/2009 | Treatment Summary: | FRAC'D CODELL W/134,022 GALS OF SLICK WATER, SILVERSTIM, AND 15% HCI WITH 270.000#S OF OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7162 ft. | # Of Holes: | 88 | Interval Bottom: | 7184 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/12/2024 Interval Top: 6853 ft. Interval Bottom: 7184 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/2/2009 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/6/2009 | Treatment Summary: | COMINGLE CODELL AND NIOBRARA. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 23 | BBLS_OIL | 36 | BTU_GAS | 1284 | CALC_BBLS_H2O | 23 | CALC_BBLS_OIL | 36 | CALC_GOR | 2750 | CALC_MCF_GAS | 99 | CASING_PRESS | 750 | GRAVITY_OIL | 51 | MCF_GAS | 99 | TUBING_PRESS | 0 |
| Perforation Data: | Interval Top: | 6853 ft. | # Of Holes: | 136 | Interval Bottom: | 7184 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 1/12/2021 Interval Top: 6853 ft. Interval Bottom: 6986 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/2/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/30/2009 | Treatment Summary: | FRAC'D NIOBRARA W/176,568 GALS OF SLICK WATER, SILVERSTIM AND 15% HCI WITH 250,000#S OF OTTAWA SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6853 ft. | # Of Holes: | 48 | Interval Bottom: | 6986 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
Reported Plugged | Y | 08/12/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|