|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/18/2019 Measured TD: 8182 ft. Vertical TD: 7708 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/18/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/25/2012 | | Proposed Top PZ Location: | Sec:11 Twp: 2N 65W | Footage: 644 FNL 678 FEL | | Bottom Hole Location: | Sec:11 Twp: 2N 65W | Footage: 644 FNL 678 FEL | | Proposed Depth/Form: | 8182 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N2NE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 823 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 823 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8175 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 417, Top: 3600 ft., Bottom: 8175 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 2/3/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8182 ft. | Measured PB depth: | 8158 ft. | | True Vertical TD: | 7708 ft. | True Vertical PB depth: | 7648 ft. | | Top PZ Location: | Sec:11 Twp: 2N 65W | Footage: 644 FNL 678 FEL | | Bottom Hole Location: | Sec:11 Twp: 2N 65W | Footage: 644 FNL 678 FEL | | Log Types: | CBL, AILC, CNLD, ML, TRIPLE COMBO | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 823 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 823 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8175 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 202, Top: 6616 ft., Bottom: 8175 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3472 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 1760 ft., Bottom: 3472 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1760 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 420 ft., Bottom: 1760 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5352 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 3588 ft., Bottom: 5408 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1760 ft., Depth: 8175 ft., Bottom: 2750 ft., Sacks: 475, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 420 ft., Depth: , Bottom: 1756 ft., Sacks: 250, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4328 ft. | 4468 ft. | N | N | | SUSSEX | 4595 ft. | 4753 ft. | N | N | | SHANNON | 4955 ft. | 4986 ft. | N | N | | NIOBRARA | 7286 ft. | | N | N | | FORT HAYS | 7554 ft. | | N | N | | CODELL | 7577 ft. | | N | N | | J SAND | 8033 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 6/18/2019 Interval Top: 8035 ft. Interval Bottom: 8074 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/18/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/15/2010 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 163,338 gal Slickwater w/ 115,860# 40/70, 4,000# SB Excel. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7984 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/13/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 7 | | BTU_GAS | 1252 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 5857 | | CALC_MCF_GAS | 41 | | CASING_PRESS | 918 | | GRAVITY_OIL | 40 | | MCF_GAS | 41 | | TUBING_PRESS | 555 |
| | Perforation Data: | | Interval Top: | 8035 ft. | # Of Holes: | 66 | | Interval Bottom: | 8074 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7578 ft. Interval Bottom: 7594 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/16/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/30/2009 | | Treatment Summary: | 180751 GALS FLUID & 115360 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7578 ft. | # Of Holes: | 48 | | Interval Bottom: | 7594 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/18/2019 Interval Top: 7341 ft. Interval Bottom: 7594 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/16/2009 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/8/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/22/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1191 | | CALC_BBLS_OIL | 41 | | CALC_GOR | 8100 | | CALC_MCF_GAS | 332 | | CASING_PRESS | 650 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7341 ft. | # Of Holes: | 114 | | Interval Bottom: | 7594 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/12/2012 Interval Top: 7341 ft. Interval Bottom: 7452 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/16/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/6/2009 | | Treatment Summary: | 252011 GALS FLUID & 199820 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7341 ft. | # Of Holes: | 66 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/18/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|