|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/8/2023 Measured TD: 8177 ft. Vertical TD: 7840 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/8/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20091577 | Expiration Date: | 5/14/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 650 FNL 2055 FWL | | Bottom Hole Location: | Sec:5 Twp: 5N 67W | Footage: 650 FNL 2055 FWL | | Proposed Depth/Form: | 8161 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NW |
| | |
| Wellbore Completed | | Completion Date: | 2/28/2010 | | Spud Date: | 2/25/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8177 ft. | Measured PB depth: | 8129 ft. | | True Vertical TD: | 7840 ft. | True Vertical PB depth: | 7792 ft. | | Top PZ Location: | Sec:5 Twp: 5N 67W | Footage: 658 FNL 2137 FWL | | Bottom Hole Location: | Sec:5 Twp: 5N 67W | Footage: 658 FNL 2137 FWL | | Log Types: | P/E AILC-CNDL-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 771 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 771 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8167 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1020, Top: 830 ft., Bottom: 8167 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2466 ft. | | N | N | | PARKMAN | 3744 ft. | | N | N | | SUSSEX | 4282 ft. | 4576 ft. | N | N | | SHANNON | 4901 ft. | 5002 ft. | N | N | | NIOBRARA | 7233 ft. | | N | N | | FORT HAYS | 7530 ft. | | N | N | | CODELL | 7550 ft. | | N | N | | J SAND | 8014 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 4/8/2010 Interval Top: 7550 ft. Interval Bottom: 7572 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/26/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/12/2010 | | Treatment Summary: | 190,425 GALS FLUID & 150,000 LBS 40/70 SAND & 4,000 LBS SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7550 ft. | # Of Holes: | 66 | | Interval Bottom: | 7572 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/8/2023 Interval Top: 7248 ft. Interval Bottom: 7572 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/26/2010 | Choke Size: | 0.313 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2010 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/8/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1292 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 1322 | | CALC_MCF_GAS | 37 | | CASING_PRESS | 160 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7248 ft. | # Of Holes: | 128 | | Interval Bottom: | 7572 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 4/8/2010 Interval Top: 7248 ft. Interval Bottom: 7448 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/26/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2010 | | Treatment Summary: | 500 GALS ACID & 250,699 GALS FLUID & 200,120 LBS 40/70 SAND & 4,000 LBS OF SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7248 ft. | # Of Holes: | 62 | | Interval Bottom: | 7448 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/08/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|