|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2024 Measured TD: 7579 ft. Vertical TD: 7441 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/12/2012 | Proposed Top PZ Location: | Sec:33 Twp: 4N 67W | Footage: 646 FNL 673 FWL | Bottom Hole Location: | Sec:33 Twp: 4N 67W | Footage: 646 FNL 673 FWL | Proposed Depth/Form: | 8170 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NW/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 420, Top: 0 ft., Bottom: 700 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8170 ft., Weight: 11.5 , Citings Type: PLANNED | Cement: | Sacks: 750, Top: , Bottom: 8170 ft. |
| | |
Wellbore Completed | Completion Date: | 4/15/2011 | Spud Date: | 4/10/2011 | Spud Date Is: | ACTUAL | Measured TD: | 7579 ft. | Measured PB depth: | 7535 ft. | True Vertical TD: | 7441 ft. | True Vertical PB depth: | 7397 ft. | Top PZ Location: | Sec:33 Twp: 4N 67W | Footage: 646 FNL 673 FWL | Bottom Hole Location: | Sec:33 Twp: 4N 67W | Footage: 646 N 673 W | Log Types: | Triple combo, high resolution induction, compensated density, compensated neutron log | Log Types: | High resolution induction, Compensated Density, Compensated Neutron, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 728 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 580, Top: 0 ft., Bottom: 728 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7548 ft., Weight: 11.3 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 2620 ft., Bottom: 7548 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3742 ft. | | | | SUSSEX | 4256 ft. | | | | SHANNON | 4798 ft. | | | | NIOBRARA | 7124 ft. | | | | FORT HAYS | 7388 ft. | | | | CODELL | 7407 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 6/24/2024 Interval Top: 7407 ft. Interval Bottom: 7420 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 12/15/2017 | Treatment End Date: | 12/15/2017 | Treatment Summary: | 4,095 BBL fresh water, 372 BBL treated water, 146,437 lbs Premium White #40/70, 12,822 lbs CRC 40/70 | Total fluid used in treatment (bbls): | 4467 | Max pressure during treatment (psi): | 4777 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.90 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 171 | Fresh water used in treatment (bbls): | 4095 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 159259 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 6/10/2011 | Treatment Summary: | MOLRU Halliburton open well 14:30 0 press
load and break 4661 psi@29.58 bpm isip 2958 psi
5 min 2559.0 psi 399psi leakoff pump 500 gal 7 1/2 %
acid pumped 1 thru 4 ppg 251000 # 20/40/ ottawa
2240.7 bbls pHaser 762.5 bbls phaser 2120.6 bbls SLF
average press 4162 psi average rate 52.48 bpm.
max press4661 psi max rate 53.75 bpm flush 115 bbls
isip 3232.0 psi 5min 3158.0 psi 10min 3111.0 psi
15 min 3073.0 psi . Load to recover 3267.6 bbls
LOAD TO RECOVER 3267.6 bbls |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 50 | BTU_GAS | 1427 | CALC_BBLS_H2O | 3 | CALC_BBLS_OIL | 50 | CALC_GOR | 4040 | CALC_MCF_GAS | 202 | GRAVITY_OIL | 49 | MCF_GAS | 202 |
| Perforation Data: | Interval Top: | 7407 ft. | # Of Holes: | 52 | Interval Bottom: | 7420 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 6/1/2024 Interval Top: 7132 ft. Interval Bottom: 7420 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/20/2017 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 22 | BTU_GAS | 1390 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 22 | CALC_GOR | 4909 | CALC_MCF_GAS | 108 | CASING_PRESS | 450 | GRAVITY_OIL | 52 | MCF_GAS | 108 |
| Perforation Data: | Interval Top: | 7132 ft. | # Of Holes: | 364 | Interval Bottom: | 7420 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/24/2024 Interval Top: 7132 ft. Interval Bottom: 7296 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 12/15/2017 | Treatment End Date: | 12/15/2017 | Treatment Summary: | 4,948 BBL fresh water, 74 BBL treated water, 24 BBL 15% HCl, 214,928 lbs Premium White #40/70, 11,013 lbs CRC #40/70 | Total fluid used in treatment (bbls): | 5046 | Max pressure during treatment (psi): | 4813 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.90 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 172 | Fresh water used in treatment (bbls): | 4948 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 225941 | Green completions techniques utilized: | No | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7132 ft. | # Of Holes: | 312 | Interval Bottom: | 7296 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 258 |
Total Gas Produced (MCF) | 4452 |
GOR | 17255 |
GOR Determination | MCFE |
Average BOE per Day | 2.807 |
Average MCFE per Day | 16.276 |
Federal Financial Assurance | i | |
|
|