|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/5/2011 Measured TD: 7576 ft. Vertical TD: 7229 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/5/2011 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/13/2012 | | Proposed Top PZ Location: | Sec:1 Twp: 2N 66W | Footage: 1005 FSL 1963 FWL | | Bottom Hole Location: | Sec:1 Twp: 2N 66W | Footage: 1005 FSL 1963 FWL | | Proposed Depth/Form: | 856 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 856 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 410, Top: , Bottom: 856 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 7499 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: , Bottom: 7499 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 11717 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: , Bottom: 11717 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/18/2011 | | Spud Date: | 1/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7576 ft. | Measured PB depth: | 7182 ft. | | True Vertical TD: | 7229 ft. | True Vertical PB depth: | 7049 ft. | | Bottom Hole Location: | Sec:1 Twp: 2N 66W | Footage: 1005 FSL 1963 FWL | | Log Types: | GR-CCL-CB-VDL-SM,WSA,WAA,CS-NG,ERMICP | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 875 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: , Size: , Top: 0 ft., Depth: 7532 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 185, Top: 7182 ft., Bottom: 7532 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7385 ft. | | | | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: SI - 3/1/2024 Measured TD: 11762 ft. Vertical TD: 7139 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW SI - 3/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/31/2013 | | Proposed Top PZ Location: | Sec:1 Twp: 2N 66W | Footage: 1016 FSL 2022 FWL | | Bottom Hole Location: | Sec:1 Twp: 2N 66W | Footage: 467 FNL 1672 FEL | | Proposed Depth/Form: | 11757 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 875 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7607 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 1250, Top: 5894 ft., Bottom: 7607 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6532 ft., Depth: 11757 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 1/30/2011 | | Spud Date: | 1/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 11762 ft. | Measured PB depth: | 11743 ft. | | True Vertical TD: | 7139 ft. | True Vertical PB depth: | 7139 ft. | | Top PZ Location: | Sec:1 Twp: 2N 66W | Footage: 1016 FSL 2022 FWL | | Bottom Hole Location: | Sec:1 Twp: 2N 66W | Footage: 467 FNL 1672 FEL | | Log Types: | CBL, ADR-PCG, WSA, WAA, CSNG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 875 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7607 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 0 ft., Bottom: 7607 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6509 ft., Depth: 11757 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Additional Cement: | String Type: 1ST , Top: 7182 ft., Depth: 7532 ft., Bottom: 7532 ft., Sacks: 185, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7358 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 3/1/2024 Interval Top: 7657 ft. Interval Bottom: 11687 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/28/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 2/23/2011 | | Treatment Summary: | FRAC'D THRU AN OPEN HOLE LINER BETWEEN 7657-11687. AVERATE TREATING PRESSURE 4688, AVERAGE RATE 51.1,
TOTAL BBLS FLUID 78461, AND TOTAL SAND WEIGHT 3791721. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7034 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/3/2011 | Test Method: | FLOWING | | Hours Tested: | 20 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 659 | | BBLS_OIL | 147 | | BTU_GAS | 1297 | | CALC_BBLS_H2O | 791 | | CALC_BBLS_OIL | 176 | | CALC_GOR | 1405 | | CALC_MCF_GAS | 563 | | CASING_PRESS | 2675 | | GRAVITY_OIL | 51 | | MCF_GAS | 469 | | TUBING_PRESS | 2075 |
| | Perforation Data: | | Interval Top: | 7657 ft. | # Of Holes: | | | Interval Bottom: | 11687 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|