|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/6/2019 Measured TD: 7730 ft. Vertical TD: 7351 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/6/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | 20086284 | Expiration Date: | 11/25/2009 | Proposed Top PZ Location: | Sec:33 Twp: 3N 68W | Footage: 2558 FSL 2555 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 68W | Footage: 2558 FSL 2555 FWL | Proposed Depth/Form: | 7776 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 1/28/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7730 ft. | Measured PB depth: | 7687 ft. | True Vertical TD: | 7351 ft. | True Vertical PB depth: | 7308 ft. | Top PZ Location: | Sec:33 Twp: 3N 68W | Footage: 2558 FSL 2555 FWL | Bottom Hole Location: | Sec:33 Twp: 3N 68W | Footage: 2576 S 2536 W | Log Types: | CBL, CDL/CNL/ML, DIL/GL/GR | Log Types: | | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 905 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7717 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 2630 ft., Bottom: 7717 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1500 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 470 ft., Bottom: 1520 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 594 ft., Depth: 1500 ft., Bottom: 1510 ft., Sacks: 150, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 1320 ft., Depth: 1708 ft., Bottom: 1510 ft., Sacks: 25, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 2000 ft., Depth: 2000 ft., Bottom: 2200 ft., Sacks: 108, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3667 ft. | 4006 ft. | N | N | SUSSEX | 4270 ft. | 4503 ft. | N | N | SHANNON | 4763 ft. | 4802 ft. | N | N | NIOBRARA | 7276 ft. | | N | N | FORT HAYS | 7523 ft. | | N | N | CODELL | 7543 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/18/2009 Interval Top: 7546 ft. Interval Bottom: 7566 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/11/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/5/2009 | Treatment Summary: | 201,729 GALS FLUID & 150,460 LBS 40/70 OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7546 ft. | # Of Holes: | 60 | Interval Bottom: | 7566 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/6/2019 Interval Top: 7290 ft. Interval Bottom: 7566 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/11/2009 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/1/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1246 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 125 | CALC_GOR | 1730 | CALC_MCF_GAS | 124 | CASING_PRESS | 600 | GRAVITY_OIL | 50 |
| Perforation Data: | Interval Top: | 7290 ft. | # Of Holes: | 124 | Interval Bottom: | 7566 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/18/2009 Interval Top: 7290 ft. Interval Bottom: 7434 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/11/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/13/2009 | Treatment Summary: | 500 GALS ACID & 250,753 GALS FLUID & 200,340 LBS 40/70 SAND & 8,000 LBS 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7290 ft. | # Of Holes: | 64 | Interval Bottom: | 7434 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 03/06/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|