Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29524
Well Classification: OW Status: PA - 1/19/2017
Well Name/No:NEWBY #12-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/19/2017
FacilityID:299785LocationID:336498
County:WELD #123Location:SWSW 33 3N68W 6
Field:WATTENBERG - #90750Elevation:4925 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1296FSL  1291 FWLLat/Long: 40.178430 / -105.012680Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.178436 / -105.012703Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/13/2016             Measured TD: 7780 ft.    Vertical TD: 7682 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/13/2016
Wellbore PermitDIRECTIONAL
Permit #:20086292 Expiration Date:11/20/2009
Proposed Top PZ Location:Sec:33 Twp: 3N 68W Footage: 2004 FSL  606 FWL
Bottom Hole Location:Sec:33 Twp: 3N 68W Footage: 2004 FSL  606 FWL
Proposed Depth/Form:7749 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N2SW4

Wellbore Completed
Completion Date:1/12/2009
Spud Date:1/7/2009Spud Date Is:ACTUAL
Measured TD:7780 ft.Measured PB depth:7747 ft.
True Vertical TD:7682 ft.True Vertical PB depth:7649 ft.
Top PZ Location:Sec:33 Twp: 3N 68WFootage: 2004 FSL  606 FWL
Bottom Hole Location:Sec:33 Twp: 3N 68WFootage: 2004 FSL  606 FWL
Log Types:CVL-CNL-CDL-DIL-GR-ML, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 871 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 871 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7777 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 982, Top: 2400 ft., Bottom: 7777 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3502 ft.3750 ft.NN
SUSSEX4039 ft.4244 ft.NN
SHANNON4488 ft.4550 ft.NN
NIOBRARA6955 ft.NN
FORT HAYS7189 ft.NN
CODELL7210 ft.NN
J SAND7620 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/25/2009                 Interval Top: 7211 ft.    Interval Bottom: 7234 ft.

 Completed Information for Formation CODELL
1st Production Date:7/21/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/4/2009
Treatment Summary:190,697 GALS FLUID & 152,820 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7211 ft.# Of Holes:60
Interval Bottom:7234 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 1/19/2017                 Interval Top: 6995 ft.    Interval Bottom: 7234 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/21/2009Choke Size:0.281 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/12/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/25/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1245
CALC_BBLS_H2O 0
CALC_BBLS_OIL 63
CALC_GOR 2340
CALC_MCF_GAS 147
CASING_PRESS 550
GRAVITY_OIL 50
Perforation Data:
Interval Top:6995 ft.# Of Holes:120
Interval Bottom:7234 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/25/2009                 Interval Top: 6995 ft.    Interval Bottom: 7100 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/21/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/6/2009
Treatment Summary:1000 GALS ACID & 248,296 GALS FLUID & 195,000 LBS 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6995 ft.# Of Holes:60
Interval Bottom:7100 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/19/2017
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No