|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/4/2017 Measured TD: 8615 ft. Vertical TD: 8326 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/4/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/19/2012 | Prop Depth/Form: | 8615 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N2SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 704 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 480, Top: 0 ft., Bottom: 704 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8601 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 800, Top: 3552 ft., Bottom: 8601 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 1/13/2009 | Spud Date Is: | ACTUAL | Measured TD: | 8615 ft. | Measured PB depth: | 8571 ft. | True Vertical TD: | 8326 ft. | True Vertical PB depth: | 8282 ft. | Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 1989 FSL 669 FEL | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 1989 FSL 669 FEL | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 704 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 480, Top: 0 ft., Bottom: 704 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8601 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 800, Top: 4168 ft., Bottom: 8601 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3806 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 365, Top: 1846 ft., Bottom: 3806 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4234 ft. | 4472 ft. | N | N | SUSSEX | 4694 ft. | 4880 ft. | N | N | SHANNON | 5288 ft. | 5310 ft. | N | N | NIOBRARA | 7663 ft. | | N | N | FORT HAYS | 7994 ft. | | N | N | CODELL | 8016 ft. | | N | N | J SAND | 8446 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 10/31/2017 Interval Top: 8456 ft. Interval Bottom: 8474 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/18/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/9/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 148,848 gal Slickwater w/ 114,840# 40/70, 4,280# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8456 ft. | # Of Holes: | 54 | Interval Bottom: | 8474 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/7/2011 Interval Top: 8016 ft. Interval Bottom: 8034 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/17/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/9/2009 | Treatment Summary: | 203,753 GALS FLUID &159,420 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8016 ft. | # Of Holes: | 72 | Interval Bottom: | 8034 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/1/2011 Interval Top: 7662 ft. Interval Bottom: 8474 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 3/18/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/9/2011 | Treatment Summary: | JSND RECOMPLETE |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8417 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/1/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 5 | BTU_GAS | 1330 | CALC_BBLS_OIL | 5 | CALC_GOR | 91600 | CALC_MCF_GAS | 458 | CASING_PRESS | 549 | GRAVITY_OIL | 50 | MCF_GAS | 458 | TUBING_PRESS | 311 |
| Perforation Data: | Interval Top: | 7662 ft. | # Of Holes: | 198 | Interval Bottom: | 8474 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/31/2017 Interval Top: 7662 ft. Interval Bottom: 8034 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/17/2009 | Choke Size: | 0.375 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/18/2009 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7996 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/25/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1281 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 50 | CALC_GOR | 3220 | CALC_MCF_GAS | 161 | CASING_PRESS | 310 | GRAVITY_OIL | 50 | TUBING_PRESS | 310 |
| Perforation Data: | Interval Top: | 7662 ft. | # Of Holes: | 144 | Interval Bottom: | 8034 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/7/2011 Interval Top: 7662 ft. Interval Bottom: 7896 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/17/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/11/2009 | Treatment Summary: | 1000 GALS ACID & 239,971 GALS FLUID & 200,020 LBS 30/50 SAND & 4,000LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7662 ft. | # Of Holes: | 72 | Interval Bottom: | 7896 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 05/04/2017 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|