|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 1/3/2020 Measured TD: 8585 ft. Vertical TD: 8379 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 1/3/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20086074 | Expiration Date: | 11/16/2009 | | Proposed Top PZ Location: | Sec:4 Twp: 1N 68W | Footage: 647 FSL 635 FWL | | Bottom Hole Location: | Sec:4 Twp: 1N 68W | Footage: 647 FSL 635 FWL | | Proposed Depth/Form: | 8615 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2SW4 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 7/17/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8585 ft. | Measured PB depth: | 8535 ft. | | True Vertical TD: | 8379 ft. | True Vertical PB depth: | 8329 ft. | | Top PZ Location: | Sec:4 Twp: 1N 68W | Footage: 647 FSL 635 FWL | | Bottom Hole Location: | Sec:4 Twp: 1N 68W | Footage: 647 FSL 635 FWL | | Log Types: | NO O/H LOGS, CBL, PNN | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 817 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 510, Top: 0 ft., Bottom: 817 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8571 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 770, Top: 3460 ft., Bottom: 8571 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3150 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 597, Top: 90 ft., Bottom: 3198 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 50 ft., Depth: 8571 ft., Bottom: 3200 ft., Sacks: 597, Method: NON CEMENT SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4162 ft. | | N | N | | SUSSEX | 4535 ft. | | N | N | | SHANNON | 5174 ft. | | N | N | | NIOBRARA | 7690 ft. | | N | N | | CODELL | 8020 ft. | | N | N | | J SAND | 8455 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/12/2009 Interval Top: 8002 ft. Interval Bottom: 8020 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/27/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2009 | | Treatment Summary: | 199785 GALS FLUID & 154820 LBS 40/70 SAND & 4100 LBS SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8002 ft. | # Of Holes: | 54 | | Interval Bottom: | 8020 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/3/2020 Interval Top: 7661 ft. Interval Bottom: 8020 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/27/2009 | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/27/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/12/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1335 | | CALC_BBLS_OIL | 41 | | CALC_GOR | 2098 | | CALC_MCF_GAS | 86 | | CASING_PRESS | 2850 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7661 ft. | # Of Holes: | 120 | | Interval Bottom: | 8020 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/12/2009 Interval Top: 7661 ft. Interval Bottom: 7878 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/27/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2009 | | Treatment Summary: | 235863 GALS FLUID & 205120 LBS 40/70 SAND & 4260 LBS SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7661 ft. | # Of Holes: | 66 | | Interval Bottom: | 7878 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/03/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|