Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29456
Well Classification: OW Status: PA - 2/20/2019
Well Name/No:SEC FOUR #21-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/20/2019
FacilityID:299655LocationID:336085
Municipality/County:ERIE / WELD #123Location:NWNW 4 1N68W 6
Field:SPINDLE - #77900Elevation:5028 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1293FNL  1302 FWLLat/Long: 40.084110 / -105.013060Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.084114 / -105.013061Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/20/2019             Measured TD: 8075 ft.    Vertical TD: 7936 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/20/2019
Wellbore PermitDIRECTIONAL
Permit #:20086081 Expiration Date:11/16/2009
Proposed Top PZ Location:Sec:4 Twp: 1N 68W Footage: 1330 FNL  2505 FWL
Bottom Hole Location:Sec:4 Twp: 1N 68W Footage: 1330 FNL  2505 FWL
Proposed Depth/Form:8095 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:N/A
Spud Date:6/28/2009Spud Date Is:ACTUAL
Measured TD:8075 ft.Measured PB depth:8032 ft.
True Vertical TD:7936 ft.True Vertical PB depth:7893 ft.
Top PZ Location:Sec:4 Twp: 1N 68WFootage: 1330 FNL  2505 FWL
Bottom Hole Location:Sec:4 Twp: 1N 68WFootage: 1330 FNL  2505 FWL
Log Types:CD-CN-ML, SONIC BOND, DIL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 817 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 0 ft., Bottom: 817 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8068 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 2524 ft., Bottom: 8068 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2453 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 425 ft., Bottom: 2466 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 700 ft., Depth: 2453 ft., Bottom: 2464 ft., Sacks: 405, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND1775 ft.1920 ft.NN
PARKMAN4188 ft.4400 ft.NN
SUSSEX4632 ft.4850 ft.NN
SHANNON5195 ft.5300 ft.NN
NIOBRARA7579 ft.NN
FORT HAYS7881 ft.NN
CODELL7902 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/16/2009                Interval Top: 7904 ft.    Interval Bottom: 7924 ft.

 Completed Information for Formation CODELL
1st Production Date:11/2/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/5/2009
Treatment Summary:200080 GALS FLUID & 150640 LBS 40/70 SAND & 4040 LBS 20/40 R/C SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7904 ft.# Of Holes:60
Interval Bottom:7924 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/20/2019                 Interval Top: 7670 ft.    Interval Bottom: 7924 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/2/2009Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/2/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/16/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1331
CALC_BBLS_OIL 82
CALC_GOR 2330
CALC_MCF_GAS 191
CASING_PRESS 2800
GRAVITY_OIL 51
Perforation Data:
Interval Top:7670 ft.# Of Holes:132
Interval Bottom:7924 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/16/2009                Interval Top: 7670 ft.    Interval Bottom: 7789 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/2/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/6/2009
Treatment Summary:500 GALS ACID & 200651 GALS FLUID & 153100 LBS 40/70 SAND & 4020 LBS 20/40 R/C SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7670 ft.# Of Holes:72
Interval Bottom:7789 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/20/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No