|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/31/2025 Measured TD: 7769 ft. Vertical TD: 7650 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/31/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/12/2012 | | Proposed Top PZ Location: | Sec:24 Twp: 5N 67W | Footage: 2531 FSL 1309 FWL | | Bottom Hole Location: | Sec:24 Twp: 5N 67W | Footage: 2531 FSL 1309 FWL | | Proposed Depth/Form: | 7759 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 510 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 210, Top: 0 ft., Bottom: 510 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7759 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 733, Top: , Bottom: 7759 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/4/2011 | | Spud Date: | 7/1/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7769 ft. | Measured PB depth: | 7715 ft. | | True Vertical TD: | 7650 ft. | True Vertical PB depth: | 7596 ft. | | Top PZ Location: | Sec:24 Twp: 5N 67W | Footage: 2553 FSL 1296 FWL | | Bottom Hole Location: | Sec:24 Twp: 5N 67W | Footage: 2553 FSL 1296 FWL | | Log Types: | CBL/GR/CCL, AC/TR/SD/DSN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 565 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 214, Top: 0 ft., Bottom: 565 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7759 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 1890 ft., Bottom: 7759 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7267 ft. | | | | | FORT HAYS | 7581 ft. | | | | | CODELL | 7602 ft. | | | | | GREENHORN | 7691 ft. | | | |
Formation NB-CD Formation Classification: OW Status: AB - 7/31/2025 Interval Top: 7286 ft. Interval Bottom: 7624 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/30/2011 | Choke Size: | 14.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/29/2011 | | Treatment Summary: | Frac'd Codell/Niobrara w/ 270,484 gals of Slick water, Silverstim, and 15% HCI with 494,840#'s of Ottawa sand.
Niobrara perfs 7286-7427 (48 holes). Codell perfs 7606-7624 (72 holes).
Commingle Codell and Niobraa. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/2/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 150 | | BBLS_OIL | 70 | | BTU_GAS | 1251 | | CALC_BBLS_H2O | 150 | | CALC_BBLS_OIL | 70 | | CALC_GOR | 2486 | | CALC_MCF_GAS | 174 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 54 | | MCF_GAS | 174 |
| | Perforation Data: | | Interval Top: | 7286 ft. | # Of Holes: | 120 | | Interval Bottom: | 7624 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/31/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 08/27/2025 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|