|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/23/2018 Measured TD: 8368 ft. Vertical TD: 8289 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/23/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/23/2012 | | Proposed Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 756 FSL 1984 FWL | | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 761 FSL 1991 FWL | | Proposed Depth/Form: | 8368 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2SW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 929 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 929 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8353 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 670, Top: 4402 ft., Bottom: 8353 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/14/2009 | | Spud Date: | 3/10/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8368 ft. | Measured PB depth: | 8322 ft. | | True Vertical TD: | 8289 ft. | True Vertical PB depth: | 8243 ft. | | Top PZ Location: | Sec:35 Twp: 2N 68W | Footage: 756 FSL 1984 FWL | | Bottom Hole Location: | Sec:35 Twp: 2N 68W | Footage: 756 FSL 1984 FWL | | Log Types: | CBL, ML, AILC, TRIPLE COMBO, CNLD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 929 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8353 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 4402 ft., Bottom: 8353 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4095 ft. | 4167 ft. | N | N | | SUSSEX | 4542 ft. | 4838 ft. | N | N | | SHANNON | 5084 ft. | 5240 ft. | N | N | | NIOBRARA | 7455 ft. | | N | N | | FORT HAYS | 7742 ft. | | N | N | | CODELL | 7761 ft. | | N | N | | J SAND | 8196 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/23/2018 Interval Top: 8208 ft. Interval Bottom: 8228 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/22/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/26/2012 | | Treatment Summary: | "PERF AND FRAC FROM 8208-8228.
4061 BBL SLICKWATER, - 4061 BBL TOTAL FLUID
4,000# 20/40 SUPER LC, - 115,600# 40/70 OTTAWA-LG EVEREST-HENDERSON, - 115,600# TOTAL SAND."
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8208 ft. | # Of Holes: | 60 | | Interval Bottom: | 8228 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 3/14/2012 Interval Top: 7764 ft. Interval Bottom: 7782 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/16/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/15/2009 | | Treatment Summary: | 196,938 GALS FLUID & 150,860# 40/70 SAND & 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7764 ft. | # Of Holes: | 54 | | Interval Bottom: | 7782 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/25/2012 Interval Top: 7460 ft. Interval Bottom: 8228 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/25/2012 | | Treatment Summary: | No Treatment. See comments under Submit Tab. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8169 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/25/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | BTU_GAS | 1314 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 8000 | | CALC_MCF_GAS | 16 | | CASING_PRESS | 1509 | | GRAVITY_OIL | 50 | | MCF_GAS | 16 | | TUBING_PRESS | 1503 |
| | Perforation Data: | | Interval Top: | 7460 ft. | # Of Holes: | 177 | | Interval Bottom: | 8228 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/23/2018 Interval Top: 7460 ft. Interval Bottom: 7782 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/16/2009 | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/14/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/7/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1236 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 47 | | CALC_GOR | 3070 | | CALC_MCF_GAS | 138 | | CASING_PRESS | 200 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7460 ft. | # Of Holes: | 117 | | Interval Bottom: | 7782 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/14/2012 Interval Top: 7460 ft. Interval Bottom: 7646 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/16/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/18/2009 | | Treatment Summary: | 1,000 GALS ACID & 252,000 GALS FLUID & 200,980# 40/70 SAND& 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7460 ft. | # Of Holes: | 63 | | Interval Bottom: | 7646 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/23/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|