Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29345
Well Classification: OW Status: PA - 7/18/2024
Well Name/No:PHILLIPS PC #N24-29D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/18/2024
FacilityID:299383LocationID:332729
Municipality/County:GREELEY / WELD #123Location:NWNW 24 5N67W 6
Field:WATTENBERG - #90750Elevation:4950 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:487FNL  615 FWLLat/Long: 40.390850 / -104.848720Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.390850 / -104.848740Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/18/2024             Measured TD: 7664 ft.    Vertical TD: 7580 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/18/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/6/2012
Proposed Top PZ Location:Sec:24 Twp: 5N 67W Footage: 68 FNL  1266 FWL
Bottom Hole Location:Sec:24 Twp: 5N 67W Footage: 68 FNL  1266 FWL
Proposed Depth/Form:7690 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 460 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 330, Top: 0 ft., Bottom: 460 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7690 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1157, Top: 460 ft., Bottom: 7690 ft.

Wellbore Completed
Completion Date:5/29/2011
Spud Date:5/25/2011Spud Date Is:ACTUAL
Measured TD:7664 ft.Measured PB depth:7632 ft.
True Vertical TD:7580 ft.True Vertical PB depth:7548 ft.
Top PZ Location:Sec:24 Twp: 5N 67WFootage: 68 FNL  1266 FWL
Bottom Hole Location:Sec:24 Twp: 5N 67WFootage: 68 FNL  1266 FWL
Log Types:CBL/GRL/CCL, ACL/TRL/SDL/DSNL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 554 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 554 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7680 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 1668 ft., Bottom: 7680 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7172 ft.
FORT HAYS7492 ft.
CODELL7516 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/24/2020                 Interval Top: 7518 ft.    Interval Bottom: 7538 ft.

 Completed Information for Formation CODELL
1st Production Date:6/29/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7518 ft.# Of Holes:80
Interval Bottom:7538 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/18/2024                 Interval Top: 7193 ft.    Interval Bottom: 7538 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/29/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2011
Treatment Summary:Frac'd Niobrara- Codell w/ 287322 gals of Silverstim and Slick Water with 498,644#'s of Sand. The Codell is producing through a Composite Flow Through Plug. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 8
BTU_GAS 1270
CALC_BBLS_OIL 8
CALC_GOR 6500
CALC_MCF_GAS 52
CASING_PRESS 410
GRAVITY_OIL 55
MCF_GAS 52
Perforation Data:
Interval Top:7193 ft.# Of Holes:128
Interval Bottom:7538 ft.Hole Size:0 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/24/2020                 Interval Top: 7193 ft.    Interval Bottom: 7336 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/29/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7193 ft.# Of Holes:48
Interval Bottom:7336 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/18/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No