|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/17/2024 Measured TD: 7605 ft. Vertical TD: 7485 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/17/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20085604 | Expiration Date: | 10/27/2009 | | Proposed Top PZ Location: | Sec:19 Twp: 4N 67W | Footage: 1290 FNL 36 FWL | | Bottom Hole Location: | Sec:19 Twp: 4N 67W | Footage: 1286 FNL 29 FWL | | Proposed Depth/Form: | 7627 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 665, Top: 0 ft., Bottom: 950 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7627 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7627 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/8/2009 | | Spud Date: | 4/5/2009 | Spud Date Is: | Actual | | Measured TD: | 7605 ft. | Measured PB depth: | 7569 ft. | | True Vertical TD: | 7485 ft. | True Vertical PB depth: | 7467 ft. | | Top PZ Location: | Sec:19 Twp: 4N 67W | Footage: 1290 FNL 36 FWL | | Bottom Hole Location: | Sec:19 Twp: 4N 67W | Footage: 1286 FNL 29 FWL | | Log Types: | CDL-GR-CAL-CNL-DIL-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1283 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 810, Top: 0 ft., Bottom: 1283 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7591 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 751, Top: 1900 ft., Bottom: 7591 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1283 ft., Bottom: 1283 ft., Sacks: 80, Method: | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1283 ft., Bottom: 1283 ft., Sacks: 80, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2410 ft. | | N | N | | PARKMAN | 3739 ft. | | N | N | | SUSSEX | 4187 ft. | | N | N | | SHANNON | 4746 ft. | | N | N | | NIOBRARA | 7129 ft. | | N | N | | FORT HAYS | 7420 ft. | | N | N | | CODELL | 7441 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 8/26/2009 Interval Top: 7442 ft. Interval Bottom: 7462 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/20/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/29/2009 | | Treatment Summary: | 208,257 GALS FLUID & 150,600# 40/70 SAND & 4,130# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7442 ft. | # Of Holes: | 60 | | Interval Bottom: | 7462 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/17/2024 Interval Top: 7138 ft. Interval Bottom: 7462 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/20/2009 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/20/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/26/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1340 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 2400 | | CALC_MCF_GAS | 55 | | CASING_PRESS | 2150 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7138 ft. | # Of Holes: | 120 | | Interval Bottom: | 7462 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/26/2009 Interval Top: 7138 ft. Interval Bottom: 7312 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/20/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/1/2009 | | Treatment Summary: | 241,567 GALS FLUID & 201,240# 40/70 SAND & 4,100# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7138 ft. | # Of Holes: | 60 | | Interval Bottom: | 7312 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/17/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|