|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2024 Measured TD: 7777 ft. Vertical TD: 7490 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20085610 | Expiration Date: | 10/27/2009 | Proposed Top PZ Location: | Sec:19 Twp: 4N 67W | Footage: 1474 FSL 1255 FWL | Bottom Hole Location: | Sec:19 Twp: 4N 67W | Footage: 1474 FSL 1255 FWL | Proposed Depth/Form: | 7812 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 |
| | |
Wellbore Completed | Completion Date: | 5/7/2009 | Spud Date: | 5/3/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7777 ft. | Measured PB depth: | 7734 ft. | True Vertical TD: | 7490 ft. | True Vertical PB depth: | 7447 ft. | Top PZ Location: | Sec:19 Twp: 4N 67W | Footage: 1474 FSL 1255 FWL | Bottom Hole Location: | Sec:19 Twp: 4N 67W | Footage: 1474 FSL 1255 FWL | Log Types: | CBL, P/E AILC-CNLD-ML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1290 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 810, Top: 0 ft., Bottom: 1290 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7777 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 850, Top: 830 ft., Bottom: 7777 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | GREELEY SAND | 2464 ft. | 2689 ft. | N | N | PARKMAN | 3851 ft. | 4055 ft. | N | N | SUSSEX | 4310 ft. | 4522 ft. | N | N | SHANNON | 4876 ft. | 4904 ft. | N | N | NIOBRARA | 7302 ft. | | N | N | FORT HAYS | 7600 ft. | | N | N | CODELL | 7620 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 8/24/2009 Interval Top: 7621 ft. Interval Bottom: 7641 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/20/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/1/2009 | Treatment Summary: | 197,022 GALS FLUID & 151,200# 40/70 SAND & 4,400# 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7621 ft. | # Of Holes: | 60 | Interval Bottom: | 7641 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 10/1/2024 Interval Top: 7333 ft. Interval Bottom: 7641 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 7/20/2009 | Choke Size: | 0.188 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/7/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/24/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1251 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 40 | CALC_GOR | 1730 | CALC_MCF_GAS | 69 | CASING_PRESS | 500 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7333 ft. | # Of Holes: | 114 | Interval Bottom: | 7641 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/24/2009 Interval Top: 7333 ft. Interval Bottom: 7488 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/20/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2009 | Treatment Summary: | 500 GALS ACID & 258,426 GALS FLUID & 200,560# 40/70 SAND & 4,000# 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7333 ft. | # Of Holes: | 54 | Interval Bottom: | 7488 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 352 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.162 |
Average MCFE per Day | 0.950 |
Federal Financial Assurance | i | |
|
|