Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29297
Well Classification: GW Status: SI - 4/1/2017
Well Name/No:ROOT #20-18
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2017
FacilityID:299230LocationID:302536
County:WELD #123Location:SESE 18 4N65W 6
Field:HAMBERT - #33530Elevation:4720 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1250FSL  1260 FELLat/Long: 40.308640 / -104.700860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.308619 / -104.700866Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 4/1/2017             Measured TD: 7770 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 4/1/2017
Wellbore Permit
Permit #:20085652 Expiration Date:10/22/2009
Proposed Depth/Form:7760 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:1/4/2009
Spud Date:12/29/2008Spud Date Is:ACTUAL
Measured TD:7770 ft.Measured PB depth:7732 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, P/E AILC-CNLD-ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 729 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 287, Top: 0 ft., Bottom: 729 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7762 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 1950 ft., Bottom: 7762 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2900 ft.NN
PARKMAN3700 ft.3990 ft.NN
SUSSEX4315 ft.4440 ft.NN
NIOBRARA6860 ft.NN
FORT HAYS7138 ft.NN
CODELL7160 ft.NN
J SAND7619 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/3/2009                  Interval Top: 7160 ft.    Interval Bottom: 7174 ft.

 Completed Information for Formation CODELL
1st Production Date:1/31/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/23/2009
Treatment Summary:170789 GALS FLUID & 116020 LBS 40/70 SAND & 4000 LBS 20/40 R/C
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7160 ft.# Of Holes:56
Interval Bottom:7174 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 4/1/2017                  Interval Top: 6860 ft.    Interval Bottom: 7174 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/31/2009Choke Size:0.375 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/4/2009
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7145 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/3/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1211
CALC_BBLS_H2O 0
CALC_BBLS_OIL 5
CALC_GOR 87200
CALC_MCF_GAS 436
CASING_PRESS 559
GRAVITY_OIL 51
TUBING_PRESS 465
Perforation Data:
Interval Top:6860 ft.# Of Holes:176
Interval Bottom:7174 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/3/2009                  Interval Top: 6860 ft.    Interval Bottom: 7058 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/31/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/29/2009
Treatment Summary:1000 GALS ACID & 335593 GALS FLUID & 253400 LBS 40/70 SAND & 4000 LBS 20/40 R/C
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6860 ft.# Of Holes:120
Interval Bottom:7058 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
03/31/2017
Low ProducingYProduction Period
09/2024 - 08/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No