|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/20/2023 Measured TD: 8400 ft. Vertical TD: 8234 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/20/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/1/2012 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 50 FSL 1300 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 68W | Footage: 50 FSL 1300 FEL | | Proposed Depth/Form: | 8374 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 840 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 840 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8374 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7309 ft., Bottom: 8374 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5359 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 4448 ft., Bottom: 5359 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/3/2010 | | Spud Date: | 5/30/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8400 ft. | Measured PB depth: | 8338 ft. | | True Vertical TD: | 8234 ft. | True Vertical PB depth: | 8222 ft. | | Top PZ Location: | Sec:34 Twp: 2N 68W | Footage: 85 FSL 1356 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 68W | Footage: 94 FSL 1351 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 863 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 863 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8381 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 6150 ft., Bottom: 8381 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: 0 ft., Depth: 4592 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 3640 ft., Bottom: 4592 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4668 ft. | | | | | NIOBRARA | 7508 ft. | | | | | CODELL | 7816 ft. | | | | | J SAND | 8251 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/20/2023 Interval Top: 8260 ft. Interval Bottom: 8274 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/9/2010 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND WITH 153,594 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,220# 20/40 SAND. 06/09/2010. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8260 ft. | # Of Holes: | 28 | | Interval Bottom: | 8274 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 9/13/2023 Interval Top: 7816 ft. Interval Bottom: 7836 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7816 ft. | # Of Holes: | 40 | | Interval Bottom: | 7836 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/22/2010 Interval Top: 7586 ft. Interval Bottom: 8274 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/9/2010 | | Treatment Summary: | JSND-CODL-NRR COMMINGLE. SET CBP @ 6700'. 07/12/2010. DRILLED OUT CBP @ 6700' AND CFP @ 7110'. 07/13/10. DRILLED OUT CFP @ 7960' TO COMMINGLE THE JSND-CODL-NBRR. 07/14/2010. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8236 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/22/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 84 | | BBLS_OIL | 30 | | BTU_GAS | 1215 | | CALC_BBLS_H2O | 84 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3200 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 1354 | | GRAVITY_OIL | 47 | | MCF_GAS | 96 | | TUBING_PRESS | 544 |
| | Perforation Data: | | Interval Top: | 7586 ft. | # Of Holes: | 140 | | Interval Bottom: | 8274 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/20/2023 Interval Top: 7586 ft. Interval Bottom: 7836 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/9/2010 | | Treatment Summary: | CODL-NBRR COMPLETION. SET CFP @ 7960'. 06/09/10. FRAC'D THE CODELL WITH 108,402 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,240# 20/40 SAND. 06/09/10. SET CFP @ 7110'. FRAC'D THE NIOBRARA WITH 134,064 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,460# 20/40 SAND. 06/09/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7586 ft. | # Of Holes: | 112 | | Interval Bottom: | 7836 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 9/13/2023 Interval Top: 7586 ft. Interval Bottom: 7604 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7586 ft. | # Of Holes: | 72 | | Interval Bottom: | 7604 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/20/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|