|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2022 Measured TD: 8180 ft. Vertical TD: 8157 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/7/2012 | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 1670 FSL 1330 FEL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 1670 FSL 1330 FEL | Proposed Depth/Form: | 8124 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1050 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 735, Top: 0 ft., Bottom: 1050 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7799 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 7799 ft. |
| | |
Wellbore Completed | Completion Date: | 5/19/2011 | Spud Date: | 5/14/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8180 ft. | Measured PB depth: | 8135 ft. | True Vertical TD: | 8157 ft. | True Vertical PB depth: | 8112 ft. | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 1700 FSL 1345 FEL | Bottom PZ Location: | Sec:26 Twp: 2N 66W | Footage: 1670 FSL 1330 FEL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 1707 S 1329 E | Log Types: | PRELIMINARY FORM 5 | Log Types: | P/E AILC-CNLD-CV-BHCS; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1131 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1131 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8169 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 6646 ft., Bottom: 8169 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1115 ft., Depth: 5713 ft., Bottom: 5740 ft., Sacks: 654, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 1118 ft., Depth: 5713 ft., Bottom: 5754 ft., Sacks: 654, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4240 ft. | | | | SUSSEX | 4618 ft. | 4833 ft. | | | FORT HAYS | 7240 ft. | | | | NIOBRARA | 7260 ft. | | | | CODELL | 7564 ft. | | | | J SAND | 8026 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 6/1/2020 Interval Top: 8019 ft. Interval Bottom: 8054 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/31/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/19/2011 | Treatment Summary: | J S PERF 8019-8054 HOLES 56 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,386 gal Slickwater w/ 116,020# 40/70, 4,040# SuperLC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8019 ft. | # Of Holes: | 56 | Interval Bottom: | 8054 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/6/2011 Interval Top: 7336 ft. Interval Bottom: 8054 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 8/31/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/19/2011 | Treatment Summary: | NB PERF 7336-7464 HOLES 66 SIZE 0.42
CD PERF 7565-7581 HOLES 64 SIZE 0.42
J S PERF 8019-8054 HOLES 56 SIZE 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/6/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 30 | BTU_GAS | 1309 | CALC_BBLS_OIL | 30 | CALC_GOR | 1667 | CALC_MCF_GAS | 50 | CASING_PRESS | 1052 | GRAVITY_OIL | 46 | MCF_GAS | 50 |
| Perforation Data: | Interval Top: | 7336 ft. | # Of Holes: | 186 | Interval Bottom: | 8054 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 6/1/2022 Interval Top: 7336 ft. Interval Bottom: 7581 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/31/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/19/2011 | Treatment Summary: | NB PERF 7336-7464 HOLES 66 SIZE 0.42 CD PERF 7565-7581 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 236,746 gal Slickwater w/ 200,100# 40/70, 4,340# SB Excel
Frac Codell down 4-1/2" Csg w/ 215,092 gal Slickwater w/ 150,000# 40/70, 4,180# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7336 ft. | # Of Holes: | 130 | Interval Bottom: | 7581 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 05/31/2022 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|