|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/6/2024 Measured TD: 7987 ft. Vertical TD: 7843 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/6/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/27/2012 | | Proposed Top PZ Location: | Sec:27 Twp: 3N 68W | Footage: 2525 FNL 1323 FWL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 2525 FNL 1323 FWL | | Proposed Depth/Form: | 7987 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 946 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 946 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7983 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 710, Top: 2600 ft., Bottom: 7983 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 11/10/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7987 ft. | Measured PB depth: | 7952 ft. | | True Vertical TD: | 7843 ft. | True Vertical PB depth: | 7808 ft. | | Top PZ Location: | Sec:27 Twp: 3N 68W | Footage: 2525 FNL 1323 FWL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 2520 FNL 1348 FWL | | Log Types: | CNL-CAL-GR-IEL-ML, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 946 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 946 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7983 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 2600 ft., Bottom: 7983 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1506 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 140, Top: 650 ft., Bottom: 1535 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3636 ft. | | N | N | | SUSSEX | 4132 ft. | | N | N | | SHANNON | 4657 ft. | | N | N | | NIOBRARA | 7112 ft. | | N | N | | FORT HAYS | 7382 ft. | | N | N | | CODELL | 7401 ft. | | N | N | | J SAND | 7835 ft. | 7982 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 10/4/2010 Interval Top: 7415 ft. Interval Bottom: 7431 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/15/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/12/2008 | | Treatment Summary: | 175,424 GALS FLUID & 115,840# 40/70 SAND & 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7415 ft. | # Of Holes: | 64 | | Interval Bottom: | 7431 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/6/2024 Interval Top: 7159 ft. Interval Bottom: 7431 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/15/2009 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/15/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/7/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1264 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 116 | | CALC_GOR | 1360 | | CALC_MCF_GAS | 157 | | CASING_PRESS | 2000 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7159 ft. | # Of Holes: | 119 | | Interval Bottom: | 7431 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/4/2010 Interval Top: 7159 ft. Interval Bottom: 7293 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/15/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/16/2008 | | Treatment Summary: | 1000 GALS ACID & 245,196 GALS FLUID & 201,460# 40/70 SAND & 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7159 ft. | # Of Holes: | 55 | | Interval Bottom: | 7293 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/06/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|