|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/8/2023 Measured TD: 7895 ft. Vertical TD: 7797 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/8/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | 20091578 | Expiration Date: | 5/14/2010 | Proposed Top PZ Location: | Sec: Twp: | Footage: 1980 FSL 1980 FWL | Bottom Hole Location: | Sec:5 Twp: 5N 67W | Footage: 1980 FSL 1980 FWL | Proposed Depth/Form: | 7894 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SW |
| | |
Wellbore Completed | Completion Date: | 2/21/2010 | Spud Date: | 2/17/2010 | Spud Date Is: | ACTUAL | Measured TD: | 7895 ft. | Measured PB depth: | 7850 ft. | True Vertical TD: | 7797 ft. | True Vertical PB depth: | 7752 ft. | Top PZ Location: | Sec:5 Twp: 5N 67W | Footage: 1995 FSL 1926 FWL | Bottom Hole Location: | Sec:5 Twp: 5N 67W | Footage: 1995 FSL 1926 FWL | Log Types: | SD-DSN, AC-TR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 773 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 773 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7888 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1000, Top: 320 ft., Bottom: 7888 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | GREELEY SAND | 2405 ft. | 2610 ft. | N | N | PARKMAN | 3576 ft. | 3783 ft. | N | N | SUSSEX | 4072 ft. | 4305 ft. | N | N | SHANNON | 4522 ft. | 4780 ft. | N | N | NIOBRARA | 6978 ft. | | N | N | FORT HAYS | 7277 ft. | | N | N | CODELL | 7298 ft. | | N | N | J SAND | 7765 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 8/8/2023 Interval Top: 7768 ft. Interval Bottom: 7811 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/5/2010 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/12/2010 | Treatment Summary: | 500 GALS ACID & 30,118 GALS FLUID & 121,920 LBS 20/40 & 4,160 LBS 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7768 ft. | # Of Holes: | 100 | Interval Bottom: | 7811 ft. | Hole Size: | 0.36 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/13/2010 Interval Top: 6986 ft. Interval Bottom: 7811 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/5/2010 | Choke Size: | 0.313 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/22/2010 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/13/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1292 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 176 | CALC_GOR | 1455 | CALC_MCF_GAS | 256 | CASING_PRESS | 250 | GRAVITY_OIL | 50 |
| Perforation Data: | Interval Top: | 6986 ft. | # Of Holes: | 228 | Interval Bottom: | 7811 ft. | Hole Size: | 0.36 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/8/2023 Interval Top: 6986 ft. Interval Bottom: 7322 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/5/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/22/2010 | Treatment Summary: | PERF NIO: 6986-7184 62 TOTAL PERFS, PERF CODELL 7300-7322 66 TOTAL PERFS. FRAC NIO: 500 GALS ACID & 245,842 GALS FLUID & 200,020 # 40/70 SAND & 4,000 LBS 20/40. FRAC CODELL: 209,090 GALS FLUID & 150,560 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 6986 ft. | # Of Holes: | 128 | Interval Bottom: | 7322 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 08/08/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|