|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/14/2023 Measured TD: 7675 ft. Vertical TD: 7595 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/14/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/16/2011 | | Proposed Top PZ Location: | Sec:24 Twp: 5N 67W | Footage: 879 FNL 17 FWL | | Bottom Hole Location: | Sec:24 Twp: 5N 67W | Footage: 879 FNL 16 FWL | | Proposed Depth/Form: | 7671 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 502, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7671 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1117, Top: 700 ft., Bottom: 7671 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/7/2011 | | Spud Date: | 6/3/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7675 ft. | Measured PB depth: | 7620 ft. | | True Vertical TD: | 7595 ft. | True Vertical PB depth: | 7540 ft. | | Top PZ Location: | Sec:24 Twp: 5N 67W | Footage: 879 FNL 17 FWL | | Bottom Hole Location: | Sec:24 Twp: 5N 67W | Footage: 879 FNL 16 FWL | | Log Types: | CBL/GRL/CCL, AC/TR/SD/DSN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 738 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 261, Top: 0 ft., Bottom: 738 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7665 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 1880 ft., Bottom: 7665 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7161 ft. | | | | | FORT HAYS | 7482 ft. | | | | | CODELL | 7502 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 7/24/2020 Interval Top: 7504 ft. Interval Bottom: 7526 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/29/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7504 ft. | # Of Holes: | 88 | | Interval Bottom: | 7526 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/14/2023 Interval Top: 7184 ft. Interval Bottom: 7526 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/29/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/27/2011 | | Treatment Summary: | Frac'd the Niobrara-Codell w/ 291312 gals of Silverstim and Slick Water with 501,826#'s of Ottawa sand.
The Codell is producing through a Composite Flow Through Plug.
Commingle the Niobrara and Codell. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1269 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 3333 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 180 | | GRAVITY_OIL | 53 | | MCF_GAS | 10 |
| | Perforation Data: | | Interval Top: | 7184 ft. | # Of Holes: | 136 | | Interval Bottom: | 7526 ft. | Hole Size: | 0 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 7/24/2020 Interval Top: 7184 ft. Interval Bottom: 7319 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/29/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7184 ft. | # Of Holes: | 48 | | Interval Bottom: | 7319 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/14/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|