Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29077
Well Classification: OW Status: PA - 9/14/2023
Well Name/No:PHILLIPS PC #N24-31D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/14/2023
FacilityID:298488LocationID:332729
Municipality/County:GREELEY / WELD #123Location:NWNW 24 5N67W 6
Field:WATTENBERG - #90750Elevation:4949 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:486FNL  675 FWLLat/Long: 40.390840 / -104.848510Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.390850 / -104.848520Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 9/14/2023             Measured TD: 7675 ft.    Vertical TD: 7595 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 9/14/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/16/2011
Proposed Top PZ Location:Sec:24 Twp: 5N 67W Footage: 879 FNL  17 FWL
Bottom Hole Location:Sec:24 Twp: 5N 67W Footage: 879 FNL  16 FWL
Proposed Depth/Form:7671 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 502, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7671 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1117, Top: 700 ft., Bottom: 7671 ft.

Wellbore Completed
Completion Date:6/7/2011
Spud Date:6/3/2011Spud Date Is:ACTUAL
Measured TD:7675 ft.Measured PB depth:7620 ft.
True Vertical TD:7595 ft.True Vertical PB depth:7540 ft.
Top PZ Location:Sec:24 Twp: 5N 67WFootage: 879 FNL  17 FWL
Bottom Hole Location:Sec:24 Twp: 5N 67WFootage: 879 FNL  16 FWL
Log Types:CBL/GRL/CCL, AC/TR/SD/DSN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 738 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 261, Top: 0 ft., Bottom: 738 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7665 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 1880 ft., Bottom: 7665 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7161 ft.
FORT HAYS7482 ft.
CODELL7502 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/24/2020                 Interval Top: 7504 ft.    Interval Bottom: 7526 ft.

 Completed Information for Formation CODELL
1st Production Date:6/29/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7504 ft.# Of Holes:88
Interval Bottom:7526 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 9/14/2023                 Interval Top: 7184 ft.    Interval Bottom: 7526 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/29/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/27/2011
Treatment Summary:Frac'd the Niobrara-Codell w/ 291312 gals of Silverstim and Slick Water with 501,826#'s of Ottawa sand. The Codell is producing through a Composite Flow Through Plug. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1269
CALC_BBLS_OIL 3
CALC_GOR 3333
CALC_MCF_GAS 10
CASING_PRESS 180
GRAVITY_OIL 53
MCF_GAS 10
Perforation Data:
Interval Top:7184 ft.# Of Holes:136
Interval Bottom:7526 ft.Hole Size:0 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/24/2020                 Interval Top: 7184 ft.    Interval Bottom: 7319 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/29/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7184 ft.# Of Holes:48
Interval Bottom:7319 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/14/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No