Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-29077
Well Classification: OW Status: PA - 9/14/2023
Well Name/No:PHILLIPS PC #N24-31D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/14/2023
FacilityID:298488LocationID:332729
Municipality/County:GREELEY / WELD #123Location:NWNW 24 5N67W 6
Field:WATTENBERG - #90750Elevation:4949 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:486FNL  675 FWLLat/Long: 40.390840 / -104.848510Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.390850 / -104.848520Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 9/14/2023             Measured TD: 7675 ft.    Vertical TD: 7595 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 9/14/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/16/2011
Proposed Top PZ Location:Sec:24 Twp: 5N 67W Footage: 879 FNL  17 FWL
Bottom Hole Location:Sec:24 Twp: 5N 67W Footage: 879 FNL  16 FWL
Proposed Depth/Form:7671 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 502, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7671 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1117, Top: 700 ft., Bottom: 7671 ft.

Wellbore Completed
Completion Date:6/7/2011
Spud Date:6/3/2011Spud Date Is:ACTUAL
Measured TD:7675 ft.Measured PB depth:7620 ft.
True Vertical TD:7595 ft.True Vertical PB depth:7540 ft.
Top PZ Location:Sec:24 Twp: 5N 67WFootage: 879 FNL  17 FWL
Bottom Hole Location:Sec:24 Twp: 5N 67WFootage: 879 FNL  16 FWL
Log Types:CBL/GRL/CCL, AC/TR/SD/DSN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 738 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 261, Top: 0 ft., Bottom: 738 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7665 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 1880 ft., Bottom: 7665 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7161 ft.
FORT HAYS7482 ft.
CODELL7502 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/24/2020                 Interval Top: 7504 ft.    Interval Bottom: 7526 ft.

 Completed Information for Formation CODELL
1st Production Date:6/29/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7504 ft.# Of Holes:88
Interval Bottom:7526 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 9/14/2023                 Interval Top: 7184 ft.    Interval Bottom: 7526 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/29/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/27/2011
Treatment Summary:Frac'd the Niobrara-Codell w/ 291312 gals of Silverstim and Slick Water with 501,826#'s of Ottawa sand. The Codell is producing through a Composite Flow Through Plug. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1269
CALC_BBLS_OIL 3
CALC_GOR 3333
CALC_MCF_GAS 10
CASING_PRESS 180
GRAVITY_OIL 53
MCF_GAS 10
Perforation Data:
Interval Top:7184 ft.# Of Holes:136
Interval Bottom:7526 ft.Hole Size:0 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/24/2020                 Interval Top: 7184 ft.    Interval Bottom: 7319 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/29/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7184 ft.# Of Holes:48
Interval Bottom:7319 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/14/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No