|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2025 Measured TD: 7970 ft. Vertical TD: 7761 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20084664 | Expiration Date: | 9/18/2009 | | Proposed Top PZ Location: | Sec:30 Twp: 2N 64W | Footage: 543 FSL 2026 FWL | | Bottom Hole Location: | Sec:30 Twp: 2N 64W | Footage: 543 FSL 2026 FWL | | Proposed Depth/Form: | 7982 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: W/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 7277 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 670, Top: 4466 ft., Bottom: 7277 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/19/2009 | | Spud Date: | 2/13/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7970 ft. | Measured PB depth: | 7892 ft. | | True Vertical TD: | 7761 ft. | True Vertical PB depth: | 7683 ft. | | Top PZ Location: | Sec:30 Twp: 2N 64W | Footage: 543 FSL 2026 FWL | | Bottom Hole Location: | Sec:30 Twp: 2N 64W | Footage: 543 FSL 2026 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 982 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: 997 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7953 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6250 ft., Bottom: 7953 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7040 ft. | | N | N | | CODELL | 7336 ft. | | N | N | | J SAND | 7784 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 7790 ft. Interval Bottom: 7824 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/25/2009 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE J SAND WITH 152,460 GAL 21# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,320# SAND. 02/25/2009. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7790 ft. | # Of Holes: | 44 | | Interval Bottom: | 7824 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 7336 ft. Interval Bottom: 7350 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/25/2009 | | Treatment Summary: | CDL RECOMPLETION. SET CFP@7450'. 02/25/2009. FRAC'D THE CODELL WITH 109,032 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,800# 20/40 SAND. 02/25/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7336 ft. | # Of Holes: | 28 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.42 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 3/15/2009 Interval Top: 7336 ft. Interval Bottom: 7824 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2009 | | Treatment Summary: | JSND-CDL COMMINGLE. DRILLED UP CFP @ 7450' TO COMMIUNGLE THE JSND-CDL 03-10-2009. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7783 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/15/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 83 | | BBLS_OIL | 45 | | BTU_GAS | 1155 | | CALC_BBLS_H2O | 83 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 5578 | | CALC_MCF_GAS | 251 | | CASING_PRESS | 1050 | | GRAVITY_OIL | 45 | | MCF_GAS | 251 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 7336 ft. | # Of Holes: | 72 | | Interval Bottom: | 7824 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 160 |
| Total Gas Produced (MCF) | 5503 |
| GOR | 34393 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.027 |
| Average MCFE per Day | 17.534 |
| Federal Financial Assurance | i | |
|
|