|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/11/2016 Measured TD: 6918 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/11/2016 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 6/2/2013 | Prop Depth/Form: | 7300 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE4 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 760 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 515, Top: 0 ft., Bottom: 760 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7300 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 760, Top: 0 ft., Bottom: 7300 ft. |
| | |
Wellbore Completed | Completion Date: | 4/12/2012 | Spud Date: | 4/6/2012 | Spud Date Is: | ACTUAL | Measured TD: | 6918 ft. | Measured PB depth: | 6890 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Gamma Ray CCL Cement Bond VDL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 760 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 515, Top: 13 ft., Bottom: 760 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6906 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 4797 ft., Bottom: 6906 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2406 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 740, Top: 232 ft., Bottom: 2406 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | CODELL | | 6743 ft. | N | N | FORT HAYS | | 6719 ft. | N | N | NIOBRARA | | 6463 ft. | N | N | PARKMAN | 3467 ft. | 3823 ft. | N | N | SUSSEX | 4188 ft. | 4392 ft. | N | N | SHANNON | 4801 ft. | 4980 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/21/2016 Interval Top: 6744 ft. Interval Bottom: 6756 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/10/2013 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/8/2013 | Treatment End Date: | 5/7/2013 | Treatment Summary: | Trip in and Perforated Codell 6744’ – 6756’, 12’, 4 shots per ft, 48 total. Used 3 1/8” slick gun with 19 gram 311L charges with a .41” Entry hole, 21.12” of Penetration and 60 degree phasing. | Total fluid used in treatment (bbls): | 2965 | Max pressure during treatment (psi): | 5332 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.85 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 147 | Fresh water used in treatment (bbls): | 3006 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 270440 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6744 ft. | # Of Holes: | 48 | Interval Bottom: | 6756 ft. | Hole Size: | 0.40625 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/11/2016 Interval Top: 6474 ft. Interval Bottom: 6756 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6644 ft. | Tubing Packer Depth: | 6381 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/18/2013 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 40 | BTU_GAS | 1230 | CALC_BBLS_H2O | 113 | CALC_BBLS_OIL | 24 | CALC_GOR | 2825 | CALC_MCF_GAS | 40 | GRAVITY_OIL | 48 | MCF_GAS | 113 | TUBING_PRESS | 310 |
| Perforation Data: | Interval Top: | 6474 ft. | # Of Holes: | 160 | Interval Bottom: | 6756 ft. | Hole Size: | 0.40625 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/21/2016 Interval Top: 6474 ft. Interval Bottom: 6586 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/10/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/6/2013 | Treatment End Date: | 5/8/2013 | Treatment Summary: | Set Cast Iron Flow Thru Plug at 6676’, 68’ Above top of Codell and 90’ Below bottom of Niobrara. Pull up and Perforate Niobrara B Bench 6570’-6586’, 16’, 4 shots per ft, 64 total. Pull up and Perforate Niobrara A Bench 6474’-6486’, 12’, 4 shots per ft, 48 total. Both were “Salt and Pepper”. Used a 3 1/8” Slick Gun. 2 Shots per ft were 20 gram Big Hole Charges with a .73” Entry Hole and 6.05” of Penetration and 2 Shots per ft were .35” Entry Hole and 38.09” of Penetration and 60 Degree Phasing for a Total of 112 shots.
| Total fluid used in treatment (bbls): | 4090 | Max pressure during treatment (psi): | 6698 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.92 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1039 | Fresh water used in treatment (bbls): | 4127 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 251000 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6474 ft. | # Of Holes: | 112 | Interval Bottom: | 6586 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|