|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/3/2017 Measured TD: 8040 ft. Vertical TD: 7867 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/3/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/27/2012 | | Proposed Top PZ Location: | Sec:27 Twp: 3N 68W | Footage: 652 FNL 645 FWL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 652 FNL 645 FWL | | Proposed Depth/Form: | 8040 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 906 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 906 ft. | | Casing: | String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 8024 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 345, Top: 1960 ft., Bottom: 8024 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/25/2008 | | Spud Date: | 10/17/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8040 ft. | Measured PB depth: | 7994 ft. | | True Vertical TD: | 7867 ft. | True Vertical PB depth: | 7820 ft. | | Top PZ Location: | Sec:27 Twp: 3N 68W | Footage: 652 FNL 645 FWL | | Bottom Hole Location: | Sec:27 Twp: 3N 68W | Footage: 652 FNL 645 FWL | | Log Types: | CBL, ML, AILC, CNLD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 8024 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 345, Top: 2668 ft., Bottom: 8024 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3652 ft. | 3915 ft. | N | N | | SUSSEX | 4146 ft. | 4335 ft. | N | N | | SHANNON | 4676 ft. | 4860 ft. | N | N | | NIOBRARA | 7168 ft. | | N | N | | FORT HAYS | 7422 ft. | | N | N | | CODELL | 7442 ft. | | N | N | | J SAND | 7890 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 10/4/2010 Interval Top: 7445 ft. Interval Bottom: 7465 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/30/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/19/2009 | | Treatment Summary: | 168,480 GALS FLUID & 115,200 LBS 40/70 SAND & 4,000 LBS 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7445 ft. | # Of Holes: | 60 | | Interval Bottom: | 7465 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/3/2017 Interval Top: 7191 ft. Interval Bottom: 7465 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/30/2009 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/25/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/4/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1265 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 21190 | | CALC_MCF_GAS | 339 | | CASING_PRESS | 2200 | | GRAVITY_OIL | 50 |
| | Perforation Data: | | Interval Top: | 7191 ft. | # Of Holes: | 120 | | Interval Bottom: | 7465 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/4/2010 Interval Top: 7191 ft. Interval Bottom: 7321 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/30/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/19/2008 | | Treatment Summary: | 500 GALS ACID & 253,184 GALS FLUID & 200,440 LBS 40/70 SAND & 4,000 LBS 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7191 ft. | # Of Holes: | 60 | | Interval Bottom: | 7321 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/03/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|