|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/19/2019 Measured TD: 7860 ft. Vertical TD: 7738 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/19/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | 20084317 | Expiration Date: | 9/2/2009 | Proposed Top PZ Location: | Sec:12 Twp: 2N 65W | Footage: 660 FSL 1986 FEL | Bottom Hole Location: | Sec:12 Twp: 2N 65W | Footage: 660 FSL 1986 FEL | Proposed Depth/Form: | 7841 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SE4 |
| | |
Wellbore Completed | Completion Date: | 6/3/2009 | Spud Date: | 5/31/2009 | Spud Date Is: | ACTUAL | Measured TD: | 7860 ft. | Measured PB depth: | 7815 ft. | True Vertical TD: | 7738 ft. | True Vertical PB depth: | 7693 ft. | Top PZ Location: | Sec:12 Twp: 2N 65W | Footage: 660 FSL 1986 FEL | Bottom Hole Location: | Sec:12 Twp: 2N 65W | Footage: 660 FSL 1986 FEL | Log Types: | P/E AILC-CNLD-ML, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 889 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 889 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7850 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 220, Top: 6794 ft., Bottom: 7850 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5114 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 590, Top: 825 ft., Bottom: 5120 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4046 ft. | 4220 ft. | N | N | SUSSEX | 4375 ft. | 4585 ft. | N | N | NIOBRARA | 6968 ft. | | N | N | FORT HAYS | 7233 ft. | | N | N | CODELL | 7256 ft. | | N | N | J SAND | 7705 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 9/11/2009 Interval Top: 7258 ft. Interval Bottom: 7272 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/27/2009 | Treatment Summary: | 168,294 GALS FLUID & 115,580 LBS 40/70 SAND & 4,000 LBS 20/40 R/C SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7258 ft. | # Of Holes: | 56 | Interval Bottom: | 7272 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/19/2019 Interval Top: 6974 ft. Interval Bottom: 7272 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/3/2009 | Choke Size: | 0.375 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/3/2009 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/11/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1194 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 13 | CALC_GOR | 2160 | CALC_MCF_GAS | 28 | CASING_PRESS | 500 | GRAVITY_OIL | 50 |
| Perforation Data: | Interval Top: | 6974 ft. | # Of Holes: | 116 | Interval Bottom: | 7272 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 9/11/2009 Interval Top: 6974 ft. Interval Bottom: 7118 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/3/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/29/2009 | Treatment Summary: | 1,000 GALS ACID & 220,015 GALS FLUID & 153,820 LBS 40/70 SAND & 4,000 LBS 20/40 R/C SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6974 ft. | # Of Holes: | 60 | Interval Bottom: | 7118 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 08/19/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|