|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/7/2024 Measured TD: 7587 ft. Vertical TD: 7483 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/7/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20084284 | Expiration Date: | 8/27/2009 | | Proposed Top PZ Location: | Sec:31 Twp: 5N 66W | Footage: 2553 FNL 1373 FWL | | Bottom Hole Location: | Sec:31 Twp: 5N 66W | Footage: 2553 FNL 1373 FWL | | Proposed Depth/Form: | 7586 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 11/21/2008 | | Spud Date: | 11/18/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7587 ft. | Measured PB depth: | 7523 ft. | | True Vertical TD: | 7483 ft. | True Vertical PB depth: | 7419 ft. | | Top PZ Location: | Sec:31 Twp: 5N 66W | Footage: 2553 FNL 1373 FWL | | Bottom Hole Location: | Sec:31 Twp: 5N 66W | Footage: 2553 FNL 1373 FWL | | Log Types: | GR/CCL/CBL, CDL/CNL/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 488 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 343, Top: 0 ft., Bottom: 488 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7582 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 990, Top: 286 ft., Bottom: 7582 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7103 ft. | | N | N | | FORT HAYS | 7428 ft. | | N | N | | CODELL | 7452 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 4/13/2010 Interval Top: 7452 ft. Interval Bottom: 7470 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/9/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/9/2009 | | Treatment Summary: | CODELL FRAC'D W/987 GALS 15% HCI ACID, 3,987 GALS SLICKWATER, 131,518 GALS SILVERSTIM AND 288,089# OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7452 ft. | # Of Holes: | 72 | | Interval Bottom: | 7470 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/7/2024 Interval Top: 7130 ft. Interval Bottom: 7470 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/9/2009 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/21/2008 | | Treatment Summary: | COMMINGLE THE NIOBRARA AND CODELL. CODELL IS PRODUCING THROUGH CAST IRON FLOW PLUG FROM FIRST PRODUCTION DATE 1/9/09 UNTIL TUBING WAS LANDED ON 2/20/09. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7439 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/23/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 28 | | BTU_GAS | 1263 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 5821 | | CALC_MCF_GAS | 163 | | CASING_PRESS | 330 | | GRAVITY_OIL | 54 | | MCF_GAS | 163 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 136 | | Interval Bottom: | 7470 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 4/13/2010 Interval Top: 7130 ft. Interval Bottom: 7267 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/9/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/9/2009 | | Treatment Summary: | NIOBRARA FRAC'D W/74,670 GALS SLICKWATER, 99,586 GALS SILVERSTIM AND 253,345# OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7130 ft. | # Of Holes: | 64 | | Interval Bottom: | 7267 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/07/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|