Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-28126
Well Classification: GW Status: PA - 1/16/2020
Well Name/No:SHABLE #17-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/16/2020
FacilityID:297907LocationID:332850
County:WELD #123Location:SENE 20 4N65W 6
Field:WATTENBERG - #90750Elevation:4790 ft.
Planned Location:1381FNL  1107 FELLat/Long: 40.301391 / -104.681579Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.301391 / -104.681580Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/27/2011
End Date: 4/27/2011
Reported: 5/24/2011
Prior to rule 205A.b.(2)(A)
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/16/2020             Measured TD: 7850 ft.    Vertical TD: 7818 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/16/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/13/2012
Proposed Top PZ Location:Sec:20 Twp: 4N 65W Footage: 1135 FNL  1399 FEL
Bottom Hole Location:Sec:20 Twp: 4N 65W Footage: 1135 FNL  1399 FEL
Proposed Depth/Form:7850 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 732 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 292, Top: 16 ft., Bottom: 732 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7852 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 3454 ft., Bottom: 7852 ft.

Wellbore Completed
Completion Date:9/18/2008
Spud Date:9/13/2008Spud Date Is:ACTUAL
Measured TD:7850 ft.Measured PB depth:7817 ft.
True Vertical TD:7818 ft.True Vertical PB depth:7785 ft.
Top PZ Location:Sec:20 Twp: 4N 65WFootage: 1135 FNL  1399 FEL
Bottom Hole Location:Sec:20 Twp: 4N 65WFootage: 1135 N  1399 E
Log Types:CBL, COMP T-COMBO, CPD/DSN, HVL, MRL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 730 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 292, Top: 0 ft., Bottom: 730 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7844 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 3454 ft., Bottom: 7844 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3827 ft.NN
SUSSEX4453 ft.NN
NIOBRARA6936 ft.NN
FORT HAYS7207 ft.NN
CODELL7231 ft.NN
J SAND7696 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/16/2020                 Interval Top: 7698 ft.    Interval Bottom: 7754 ft.

 Completed Information for Formation J SAND
1st Production Date:5/12/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/27/2011
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 160,902 gal Slickwater w/ 115,240# 40/70, 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7698 ft.# Of Holes:60
Interval Bottom:7754 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/10/2011                 Interval Top: 7232 ft.    Interval Bottom: 7248 ft.

 Completed Information for Formation CODELL
1st Production Date:10/24/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/2/2008
Treatment Summary:168,126 GALS FLUID & 118,900 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7232 ft.# Of Holes:64
Interval Bottom:7248 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/21/2011                 Interval Top: 6944 ft.    Interval Bottom: 7754 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:5/12/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/27/2011
Treatment Summary:JSND RECOMPLETE
Tubing Size:2.375 in.Tubing Setting Depth:7673 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/21/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
BTU_GAS 1229
CALC_BBLS_OIL 2
CALC_GOR 97000
CALC_MCF_GAS 194
CASING_PRESS 1204
GRAVITY_OIL 64
MCF_GAS 194
TUBING_PRESS 871
Perforation Data:
Interval Top:6944 ft.# Of Holes:244
Interval Bottom:7754 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/16/2020                 Interval Top: 6944 ft.    Interval Bottom: 7248 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/24/2008Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/18/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/4/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1248
CALC_BBLS_H2O 0
CALC_BBLS_OIL 11
CALC_GOR 40728
CALC_MCF_GAS 448
CASING_PRESS 1250
GRAVITY_OIL 51
Perforation Data:
Interval Top:6944 ft.# Of Holes:184
Interval Bottom:7248 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/10/2011                 Interval Top: 6944 ft.    Interval Bottom: 7128 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/24/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/2/2008
Treatment Summary:261,324 GALS FLUID & 385,158 LBS 40/70 SAND & 8220 LBS OF 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6944 ft.# Of Holes:120
Interval Bottom:7128 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/16/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No