Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-28082
Well Classification: OW Status: PA - 12/20/2022
Well Name/No:GUTTERSEN #29PU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/20/2022
FacilityID:297808LocationID:302287
County:WELD #123Location:NESW 29 4N63W 6
Field:WATTENBERG - #90750Elevation:4770 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1316FSL  2536 FWLLat/Long: 40.279690 / -104.462000Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.279690 / -104.461970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 12/20/2022             Measured TD: 6969 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 12/20/2022
Wellbore PermitDRIFTED
Permit #:20084096 Expiration Date:8/17/2009
Proposed Depth/Form:7600 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:9/21/2008
Spud Date:9/16/2008Spud Date Is:ACTUAL
Measured TD:6969 ft.Measured PB depth:6924 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 627 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 627 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6946 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 685, Top: 1034 ft., Bottom: 6946 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 1034 ft., Bottom: 5976 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6495 ft.NN
FORT HAYS6735 ft.NN
CODELL6758 ft.NN

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/20/2022                Interval Top: 6560 ft.    Interval Bottom: 6766 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/14/2008Choke Size:0.375 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/11/2008
Treatment Summary:NIOBRARA PERFS 6560'-6566' (12 HOLES) AND CODELL PERFS 6760'-6766' (12 HOLES). FRAC'D NIOBRARA/CODELL USING 1000 GALS 15% HCL, 1072 BBLS SLICKWATER PAD, 719BBLS SILVERSTIM 22# PAD, 2968 BBLS OF SILVERSTIM 22# FLUID SYSTEM, 334520 LBS OF 30/50 CONTNEXTPG
Tubing Size:2.375 in.Tubing Setting Depth:6747 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 20
BTU_GAS 1072
CALC_BBLS_H2O 6
CALC_BBLS_OIL 20
CALC_GOR 5800
CALC_MCF_GAS 116
CASING_PRESS 454
GRAVITY_OIL 46
MCF_GAS 116
TUBING_PRESS 325
Perforation Data:
Interval Top:6560 ft.# Of Holes:24
Interval Bottom:6766 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/20/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No