Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-28082
Well Classification: OW Status: PA - 12/20/2022
Well Name/No:GUTTERSEN #29PU
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/20/2022
FacilityID:297808LocationID:302287
County:WELD #123Location:NESW 29 4N63W 6
Field:WATTENBERG - #90750Elevation:4770 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1316FSL  2536 FWLLat/Long: 40.279690 / -104.462000Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.279690 / -104.461970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 12/20/2022             Measured TD: 6969 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 12/20/2022
Wellbore PermitDRIFTED
Permit #:20084096 Expiration Date:8/17/2009
Proposed Depth/Form:7600 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:9/21/2008
Spud Date:9/16/2008Spud Date Is:ACTUAL
Measured TD:6969 ft.Measured PB depth:6924 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 627 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 627 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6946 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 685, Top: 1034 ft., Bottom: 6946 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 1034 ft., Bottom: 5976 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6495 ft.NN
FORT HAYS6735 ft.NN
CODELL6758 ft.NN

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/20/2022                Interval Top: 6560 ft.    Interval Bottom: 6766 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/14/2008Choke Size:0.375 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/11/2008
Treatment Summary:NIOBRARA PERFS 6560'-6566' (12 HOLES) AND CODELL PERFS 6760'-6766' (12 HOLES). FRAC'D NIOBRARA/CODELL USING 1000 GALS 15% HCL, 1072 BBLS SLICKWATER PAD, 719BBLS SILVERSTIM 22# PAD, 2968 BBLS OF SILVERSTIM 22# FLUID SYSTEM, 334520 LBS OF 30/50 CONTNEXTPG
Tubing Size:2.375 in.Tubing Setting Depth:6747 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 20
BTU_GAS 1072
CALC_BBLS_H2O 6
CALC_BBLS_OIL 20
CALC_GOR 5800
CALC_MCF_GAS 116
CASING_PRESS 454
GRAVITY_OIL 46
MCF_GAS 116
TUBING_PRESS 325
Perforation Data:
Interval Top:6560 ft.# Of Holes:24
Interval Bottom:6766 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/20/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No