|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/23/2019 Measured TD: 7765 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/23/2019 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 12/17/2011 | | Proposed Depth/Form: | 7743 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4723 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: 4283 ft., Bottom: 4723 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/18/2010 | | Spud Date: | 3/13/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7765 ft. | Measured PB depth: | 7764 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 982 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 982 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7748 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 186, Top: 6330 ft., Bottom: 7748 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4532 ft. | | N | N | | NIOBRARA | 6824 ft. | | N | N | | CODELL | 7128 ft. | | N | N | | J SAND | 7577 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/23/2019 Interval Top: 7582 ft. Interval Bottom: 7610 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2010 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND WITH 157,332 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,600# 20/40 SAND. 03/24/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7582 ft. | # Of Holes: | 36 | | Interval Bottom: | 7610 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/10/2018 Interval Top: 7128 ft. Interval Bottom: 7142 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7128 ft. | # Of Holes: | 28 | | Interval Bottom: | 7142 ft. | Hole Size: | 0.7 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/5/2010 Interval Top: 6910 ft. Interval Bottom: 7610 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/29/2010 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @6970' AND 7240' TO COMMINGLE THE JSND-NBRR-CODL. 03/29/2010. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7555 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/5/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 68 | | BBLS_OIL | 36 | | BTU_GAS | 1161 | | CALC_BBLS_H2O | 68 | | CALC_BBLS_OIL | 36 | | CALC_GOR | 8833 | | CALC_MCF_GAS | 318 | | CASING_PRESS | 1070 | | GRAVITY_OIL | 46 | | MCF_GAS | 318 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 6910 ft. | # Of Holes: | 144 | | Interval Bottom: | 7610 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/23/2019 Interval Top: 6890 ft. Interval Bottom: 7142 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 12/10/2018 | Treatment End Date: | N/A | | Treatment Summary: | Original Form5a (doc# 01717783 and 01717784) has incorrect top perf zone but the attached wellbore diagram lists perf zone correctly | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 3/24/2010 | | Treatment Summary: | NB-CD COMPLETION. SET CFP @7240'. FRAC'D CD W/108,192 GAL 22# VISTAR HYBRID X-LINKED GEL CONTAINING 251,160# 20/40 SAND. 03/24/10. SET CFP @6970' 03/24/10. FRAC'D NB W/140,406 GAL 18# VISTAR HYBRID X-LINKED GEL CONTAINING 250020# 20/40 SAND 3/24/10. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6890 ft. | # Of Holes: | 108 | | Interval Bottom: | 7142 ft. | Hole Size: | 0.7 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/10/2018 Interval Top: 6890 ft. Interval Bottom: 6910 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6890 ft. | # Of Holes: | 80 | | Interval Bottom: | 6910 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/23/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|