|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/7/2024 Measured TD: 7983 ft. Vertical TD: 7918 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/7/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/21/2013 | | Proposed Top PZ Location: | Sec:35 Twp: 3N 67W | Footage: 66 FNL 1250 FEL | | Bottom Hole Location: | Sec:35 Twp: 3N 67W | Footage: 66 FNL 1250 FEL | | Proposed Depth/Form: | 7918 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 490 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 490 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7959 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 6430 ft., Bottom: 7959 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/18/2007 | | Spud Date: | 1/8/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7983 ft. | Measured PB depth: | 7918 ft. | | True Vertical TD: | 7918 ft. | True Vertical PB depth: | 7853 ft. | | Top PZ Location: | Sec:35 Twp: 3N 67W | Footage: 66 FNL 1250 FEL | | Bottom Hole Location: | Sec:35 Twp: 3N 67W | Footage: 66 FNL 1250 FEL | | Log Types: | CBL,DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 490 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 490 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7959 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 6430 ft., Bottom: 7959 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4262 ft. | | N | N | | NIOBRARA | 7102 ft. | | N | N | | CODELL | 7378 ft. | | N | N | | J SAND | 7814 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/7/2024 Interval Top: 7814 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/2/2007 | | Treatment Summary: | J SAND COMPLETION FRAC'D THE JSND W/ 162,212 GAL FRAC FLUID & 250,140# SAND. 2/2/07 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7814 ft. | # Of Holes: | 80 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/10/2024 Interval Top: 7378 ft. Interval Bottom: 7398 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7378 ft. | # Of Holes: | 40 | | Interval Bottom: | 7398 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/5/2012 Interval Top: 7111 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/9/2011 | | Treatment Summary: | SET CIBP AT 7435’ ON 08/26/2011, DRILLED UP ON 8/31/2011. SET CFP @ 7210’ ON 08/26/2011. DRILLED UP ON 08/30/2011. PRODUCTION TUBING SET @ 7819', COMMINGLED ON 8/31/2011. | | Formation Treatment | | Treatment Date: | 1/18/2007 | | Treatment Summary: | JSND-NBRR-CODL COMMINGLE DRILLED UP CFP @ 7250' & 7480' TO COMMINGLE THE JSND-NBRR-CODL. 3/23/07 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7819 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/9/2011 | Test Method: | FLOWING | | Hours Tested: | 5 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 13 | | BTU_GAS | 1260 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 77 | | CALC_GOR | 8727 | | CALC_MCF_GAS | 672 | | CASING_PRESS | 1023 | | GRAVITY_OIL | 54 | | MCF_GAS | 140 | | TUBING_PRESS | 746 |
| | Perforation Data: | | Interval Top: | 7111 ft. | # Of Holes: | 228 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/7/2024 Interval Top: 7111 ft. Interval Bottom: 7398 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/26/2011 | | Treatment Summary: | NIOBRARA PERFS – 7111-7128’, 4 SPF,FRAC'D 7111-7128 AND 7156-7176 W/251,280# SAND AND 158,046 GAL FRAC FLUID (8-26-11). CODELL-FRAC’D 7378’-7398’, W/131,670 GAL FRAC FLUID AND 251,080 SAND (08/26/2011). SET CIBP @ 7435’ ON 08/26/2011, DRILLED UP ON 8/31/2011. CFP SET @ 7210’ ON 08/26/2011, DRILLED UP ON 08/30/2011.
| | Formation Treatment | | Treatment Date: | 2/2/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION: SET CFP @ 7480'. FRAC'D CODELL W/ 113,440 GAL FRAC FLUID & 250,660# SAND. 2/2/07. SET CFP @ 7250'. 2/2/07. COULD NOT BREAK INTO THE NIOBRARA. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7111 ft. | # Of Holes: | 148 | | Interval Bottom: | 7398 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/10/2024 Interval Top: 7111 ft. Interval Bottom: 7176 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7111 ft. | # Of Holes: | 108 | | Interval Bottom: | 7176 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/07/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|